Galletti FLAT Series Скачать руководство пользователя страница 7

FC66001820-  00

È severamente vietata la riproduzione anche parziale di questo manuale / All copying, even partial, of this manual is strictly forbidden

FLAT

7

GB

5

INSTALLATION

FLAT unit can be installed vertically (wall/floor) or horizontally (ceiling). And

namely:

FLAT  L wall installation (100 mm from floor)
FLAT  U vertical floor installation or horizontal ceiling installation

Fasten the base unit to the wall using the 4  slots provided and the screw anchors
suitable for the characteristics of the supporting wall, keeping the bottom edge
at least 100 mm above the floor to ensure a correct intake of air and facilitate
the filter removal in the case of FLAT L model.

In case of ceiling installation check that the installation height does not exceed
the maximum value specified on the table, in order  to avoid hot air stratification
in the upper part of the room.
The height specified in the table are referred to the maximum operating speed.

Modell

Maximum installation height (m)

FLAT 10

2,0

FLAT 20 / 40

2,5

FLAT 50 / 60

2,7

FLAT 70

3,0

The water connections are on the left side,  viewing the unit from the front.

The exchanger connections can be switched over to the opposite side by
carrying out the following steps (figure 7):
- Remove the cabinet (figure 6);
- Remove front duct (4 screws)
- Remove the heat exchanger (4 screws) mounted on the base unit side panels
- remove the  lower partition;
- disconnect the motor cables from the terminal board
- remove the terminal board and mount it on the opposite side panel
- Pull the motor cable and  guide it to the opposite side; remove the plastic

cable bushing;

- Detach the condensate drainage hose  and reattach it on the opposite side;

switch over the position of the drop-stop hose and the cap on the drip tray;

- Turn the heat exchanger by 180°;
- Replace the partition on the bottom part;
- Insert the connections in the proper slots on the right side panel; fasten them

to the base unit with proper screws;

- Insert the plastic cable bushing  in the hole that was previously occupied

by condensate drainage hose, replace the cable holder on the side panel,
insert the cables and connect them to the terminal board.

- Replace front duct (4 screws)
- Stop the unused holes with condensate  proof material.
Cable guide

NOTE: the electrical wiring must always be positioned on the opposite side
of the plumbing connections.

Make the plumbing connections to the heat exchanger and, where the cooling
function is to be used, to the condensate drainage outlet.

In case of ceiling mounting, in particular when the BH accessory is present,
install the unit with a slight slope, in order to facilitate the condensate drainage.
Before switching the unit on, check that it is installed in such a way as to
guarantee the required inclination for proper condensate drainage. Warning: Do
not use thick pipes or pipes whose characteristics (i.e. corrugated conduits)
may impede the condensate flow.

It is recommended to connect the installation intake to the bottom part of the
heat exchanger and the return to the upper part of it.

Bleed air from the exchanger by means of the air vent valves (hexagonal wrench
type 10)  situated beside the plumbing connections of the exchanger.

To favour the drainage of condensate, the drain hose should be inclined
downward, at least 3 cm/m; make sure that no loops or bends form along its
path.

ELECTRICAL CONNECTIONS
Make the electrical connections with the power supply disconnected, in
accordance with current safety regulations, and following the wiring
diagrams in figure 8 and pertinent  legend.

Check that the mains electricity supply is compatible with the voltage shown
on the unit rating plate.
The electrical connections indicated must be made by the installer.
For each fan coil an (

IL

) switch should be mounted on the power supply, with

opening contacts at a distance of at least 3 mm and a suitable protection fuse
(

F

).

In the wiring diagrams the following abbreviations are used:

1

Control panel connection (accessory)

BK

Black = High speed

BU

Blue = Medium speed

CN

Fast-on connector

F

Safety fuse - not supplied

IL

Circuit breaker - not supplied

M

Motor

MS

Air outlet FLAP w/microswitch

RD

Red = Low speed

WH

White =common

On completing installation, before applying the cabinet on the base unit,
connect the cable of the microswitch to the terminal block.

Replace the cabinet. As regards FLAT U model fasten the front panel by means
of the 2 screws supplied (figure 2). As regards FLAT U model install the lower
covering panel made of galvanised steel sheet in order to assure that air is
completely  sucked from the grilles equipped with filter (figure 2).

At the end of the installation procedure, fit the air filter on the inlet and fix it in
place using the central screw provided (using a Phillips screwdriver, max length
8 cm).

6

FUNCTIONAL CHECK

- Check that the unit is properly levelled and that the drainage outlet is not

clogged (by masonry debris, etc.)

-  Check that the unit is installed in such a way as to guarantee the proper air

flow.

- Check the tightness of the plumbing connections (to the exchanger and

condensate drainage line).

- Make sure the electric wires are tightly connected (carry out this check with

the power supply OFF).

- Make sure that air has been eliminated from the heat exchanger.
- Reapply the cabinet.
- Power the fan coil and check its performance.

Содержание FLAT Series

Страница 1: ...IEN INSTALLATIONS GEBRAUCHS UND WARTUNGSANLEITUNG INSTALACIÓN USO Y MANTENIMIENTO INSTALAÇÃO USO E MANUTENÇÃO INSTALLATIE GEBRUIK EN ONDERHOUD BESZERELÉS HASZNÁLAT ÉS KARBANTARTÁS BESZERELÉS HASZNÁLAT ÉS KARBANTARTÁS BESZERELÉS HASZNÁLAT ÉS KARBANTARTÁS BESZERELÉS HASZNÁLAT ÉS KARBANTARTÁS BESZERELÉS HASZNÁLAT ÉS KARBANTARTÁS ...

Страница 2: ...006 95 CE e successive modifiche Bologna li 03 12 2009 Luigi Galletti Presidente 3 DESCRIZIONE DELL APPARECCHIO nelle figure 1 e 2 sono riportati i disegni esplosi di FLAT L e FLAT U rispettivamente dove 1 Unità base 2 Scambiatore di calore 3 Motore elettrico 4 Ventilatore centrifugo coclea e ventola in ABS 5 Vasca raccolta condensa installazione verticale 6 Vasca raccolta condensa installazione o...

Страница 3: ...orire lo scaricocondensa Primadimettereinfunzionel unità verificarechel inclinazione sia sufficiente a garantire il corretto deflusso della condensa Attenzione non utilizzare tubo di forte spessore o con caratteristiche tali es guaine elettriche corrugate da ostacolare il deflusso E consigliabile prevedere la mandata dell impianto nella parte bassa dello scambiatore di calore ed il ritorno nella p...

Страница 4: ...escamento verificare che lo scarico della condensa avvenga correttamente e che le alette dello scambiatore di calore non siano ostruite da impurità Procedere eventualmente alla loro pulizia con aria compressa o con vapore a bassa pressione senza danneggiare le alette Unamanutenzioneadeguataeperiodicasitraduceinrisparmioenergetico ed economico PULIZIA DEL FILTRO ARIA Pulire il filtro aria almeno un...

Страница 5: ...onamento 1 L apparecchio non è installato con la giusta inclinazione 2 Lo scarico condensa è ostruito SOLUZIONE 1 Ridare corrente 2 Chiedere l intervento del servizio assistenza 3 Avviare la macchina ponendo l interruttore su I 4 Aprire il FLAP 1 Pulire Il filtro aria 2 Chiedere l intervento dell installatore 3 Rimuovere l ostacolo 4 Chiedere l intervento dell installatore 5 Chiudere porte e o fin...

Страница 6: ...f EEC Directives 2006 42 CE 2004 108 CE 2006 95 CE and subsequent amendments Bologna 03 12 09 Luigi Galletti President 3 UNIT DESCRIPTION Figures1and2showtheexplodedviewofFLATLandFLATUunitsrespectively where 1 Base unit 2 Heat exchanger 3 Electric motor 4 Centrifugal fan ABS volute and fan 5 Water drip tray for vertical installation 6 Water drip tray for horizontal installation 7 Filter intake gri...

Страница 7: ...h a slight slope in order to facilitate the condensate drainage Before switching the unit on check that it is installed in such a way as to guaranteetherequiredinclinationforpropercondensatedrainage Warning Do not use thick pipes or pipes whose characteristics i e corrugated conduits may impede the condensate flow It is recommended to connect the installation intake to the bottom part of the heat ...

Страница 8: ...e check that condensate is properly drained and that the heat exchanger fins are not obstructed by impurities Clean as necessary using compressed air or low pressure steam taking care not to damage the fins Adequate periodic maintenance will save both energy and money CLEANING THE AIR FILTER Cleantheairfilteratleastonceamonthandinanycaseatthestartoftheperiod of use before the heating and the air c...

Страница 9: ...and or doors 6 the low speed has been selected 1 the unit has not been installed with the correct inclination 2 the drainage outlet is clogged REMEDY 1 Restore the power supply 2 Call a service centre for assistance 3 Start the unit by moving the switch to I 4 Open the FLAP 1 Clean the air filter 2 Call the installer for assistance 3 Remove the obstacle 4 Call the installer for assistance 5 Close ...

Страница 10: ...érieures Bologne le 03 12 09 Luigi Galletti Président 3 DESCRIPTION DE L APPAREIL Sur les figures 1 et 2 sont reportées les vues éclatées des appareils FLAT L et FLAT U respectivement où 1 Unité de base 2 Échangeurs de chaleur 3 Moteur électrique 4 Ventilateur centrifuge volute et ventilateur en ABS 5 Bac de récupération des condensats à installation verticale 6 Bac de récupération des condensats ...

Страница 11: ...rnantl installationenplafonnier toutparticulièrementlorsquel accessoire BHestprésent positionnerl unitélégèrementinclinée pourfaciliterl évacuation des condensats Avant de mettre en marche l appareil vérifier si l inclinaison suffit à assurer une évacuation correcte des condensats Attention ne pas utiliser un tuyau de grande épaisseur ou ayant des caractéristiques ex gaines ondulées pouvant empêch...

Страница 12: ...ngeur thermique il n y a pas d air Avantchaquesaisond utilisationdanslamodalitérafraîchissement vérifier que l écoulementdescondensatsalieucorrectementetsilesailettesdel échangeur sont libres d impuretés Nettoyerenl occurrence àl aircompriméouàlavapeuràbassepression sans endommager les ailettes Un entretien périodique correct se traduit par économie d énergie et de coûts NETTOYAGE DU FILTRE À AIR ...

Страница 13: ...électionnée 1 Inclinaison d installation non correcte 2 Écoulement des condensats bouché SOLUTION 1 Remettre sous tension 2 Demander l intervention du centre d assistance 3 Mettreenmarchel unitéenportantl interrupteursurI 4 Ouvrir le DÉFLECTEUR 1 Nettoyer le filtre à air 2 Demander l intervention de l installateur 3 Éliminer l obstacle 4 Demander l intervention de l installateur 5 Fermer portes et...

Страница 14: ...a 03 12 09 Luigi Galletti Präsident 3 GERÄTEBESCHREIBUNG IndenAbbildungen1und2sinddieExplosionszeichnungenderAusführungen FLAT L und FLAT U wie folgt dargestellt 1 Grundgerät 2 Wärmetauscher 3 Elektromotor 4 Fliehkraftlüfter Schnecke und Flügel aus ABS 5 Kondenswasserwanne senkrechte Installation 6 Kondenswasserwanne waagrechte Installation 7 Filter Ansauggitter mit Filter in den Modellen U 8 Verk...

Страница 15: ...erden damit das Kondenswasserbesserablaufenkann BevordasGerätinBetriebgesetztwird überprüfen dass die Neigung für einen einwandfreien Abfluss des Kondenswassers ausreicht Achtung Keine sehr dicken Leitungen oder solche z B elektrischeMäntel verwenden diedenAbflussbehindernkönnen Es empfiehlt sich die Zuleitung der Anlage an der unteren Seite des Wärmetauschers und die Rückleitung an der oberen Sei...

Страница 16: ...riodeüberprüfen dassdasKondenswassereinwandfreiablaufen kann und die Rippen des Wärmetauschers nicht mit Schmutz verstopft sind Die Rippen gegebenenfalls mit Druckluft oder Dampf mit niedrigem Druck reinigen ohne dabei die Rippen zu beschädigen Eine gute und regelmäßige Wartung hilft Energie und Geld sparen REINIGUNG DES LUFTFILTERS Den Luftfilter mindestens einmal pro Monat und vor der Verwendung...

Страница 17: ...ind offen 6 Die kleinste Betriebsgeschwindigkeit ist ausgewählt 1 Das Gerät ist nicht mit der richtigen Neigung installiert 2 Der Kondenswasserablauf ist verstopft BEHEBUNG 1 Strom einschalten 2 Kundendienst rufen 3 DasGerätdurchStellendesSchaltersaufIstarten 4 KLAPPE öffnen 1 Luftfilter reinigen 2 Installateur rufen 3 Hindernis beseitigen 4 Installateur rufen 5 Fenster und oder Türen schließen 6 ...

Страница 18: ...pectivas modificaciones Bolonia 03 12 09 Luigi Galletti Presidente 3 DESCRIPCIÓN DEL APARATO Enlasfiguras1y2aparecenlosdibujosendespiecerespectivamentedeFLAT L y FLAT U cuyos componentes son 1 Unidad base 2 Intercambiador de calor 3 Motor eléctrico 4 Ventilador centrífugo sinfín y ventilador en ABS 5 Cubeta receptora de condensación instalación vertical 6 Cubeta receptora de condensación instalaci...

Страница 19: ...dad verificar que la inclinación sea suficiente como para garantizar el correcto reflujo de la condensación Atención No utilizar tubo de gran espesor ni de características tales por ej fundas eléctricas corrugadas que puedan obstaculizar el reflujo Es aconsejable instalar el tubo de impulsión del sistema en la parte inferior del intercambiador de calor y el tubo de retorno en la parte superior del...

Страница 20: ... queladescargadelacondensaciónseefectúedemodocorrectoyquelasaletas del intercambiador de calor no estén obstruidas debido a la presencia de impurezas Eventualmente efectuar su limpieza con aire comprimido o con vapor a baja presión sin dañar las aletas Un mantenimiento adecuado y periódico se traduce en ahorro energético y económico LIMPIEZA DEL FILTRO AIRE Limpiar el filtro de aire al menos una v...

Страница 21: ...locidad mínima de funcionamiento 1 El aparato está instalado con una inclinación incorrecta 2 La descarga de condensación está obstruida SOLUCIÓN 1 Conectar nuevamente la corriente 2 Requerirlaintervencióndelserviciodeasistencia 3 Hacer arrancar la máquina disponiendo el interruptor en I 4 Abrir el FLAP 1 Limpiar el filtro aire 2 Requerir la intervención del instalador 3 Remover el obstáculo 4 Req...

Страница 22: ...etti Presidente 3 DESCRIÇÃO DO APARELHO Nas figuras 1 e 2 são apresentados os desenhos detalhados de FLAT L e FLAT U respectivamente nos quais 1 Unidade base 2 Trocador de calor 3 Motor eléctrico 4 Ventilador centrífugo cóclea e ventoinha em ABS 5 Recipiente de recolha da condensação da instalação vertical 6 Recipiente de recolha da condensação da instalação horizontal 7 Filtro grade de aspiração ...

Страница 23: ... acessório BH instale a máquina com uma leve inclinação para favorecer a descarga da condensação Antes de por a unidade para funcionar verifique se a inclinação ésuficienteparagarantiroescoamentocorretodacondensação Atenção não use tubo de espessura muito grande ou com características que atrapalhem o escoamento como os tubos elétricos corrugados por ex Éaconselhávelqueadescargadainstalaçãosejanap...

Страница 24: ...geração verificar se a descarga da condensação acontece corretamente e se as aletas do trocador de calor não estão obstruídas por impurezas Se for preciso limpar as aletas com ar comprimido ou com vapor a baixa pressão sem danificá las A manutenção adequada e periódica significa economia de energia e de custos LIMPEZA DO FILTRO DE AR Limpar o filtro de ar pelo menos uma vez por mês e antes de cada...

Страница 25: ...tá instalado com a inclinação correcta 2 A descarga da condensação está obstruída SOLUÇÃO 1 Fornecer corrente 2 Solicitaraintervençãodoserviçodeassistência 3 Ligar a máquina colocar o interruptor em I 4 Abrir o FLAP 1 Limpar o filtro de ar 2 Solicitar a intervenção do técnico de instalação 3 Remover o obstáculo 4 Solicitar a intervenção do técnico de instalação 5 Fechar portas e ou janelas 6 Selec...

Страница 26: ...n Bologna 03 12 2009 Luigi Galletti Voorzitter 3 BESCHRIJVING VAN HET APPARAAT Afbeeldingen 1 en 2 tonen de explosietekeningen van respectievelijk de FLAT L en de FLAT U bestaande uit de volgende componenten 1 Basisunit 2 Warmtewisselaar 3 Elektrische motor 4 Centrifugaalventilator wormschroef en ventilator in ABS 5 Verzamelbak condens verticale installatie 6 Verzamelbak condens horizontale instal...

Страница 27: ...et een kleine hellingshoek om de condensafvoer te bevorderen Controleer of de hellingshoek voldoende is om een correct wegvloeien van de condens mogelijk te maken alvorens u de unit inbedrijfstelt Letop voorkomhetgebruikvaneenleidingmetgrotedoorsnede of een leiding met dusdanige eigenschappen dat het wegvloeien verhinderd wordt bijv geribbelde elektrische mantels Het is raadzaam om ervoor te zorge...

Страница 28: ...of de condensafvoer correct plaatsvindt en of de bewegingen van de vinnen van de warmtewisselaar niet door onzuiverheden belemmerd worden Reinig de vinnen zonodig met perslucht of met stoom bij lage druk zonder de vinnen te beschadigen Een adequaat en regelmatig uitgevoerd onderhoud zal energie en geld besparen REINIGING VAN HET LUCHTFILTER Reinig het luchtfilter minstens één keer per maand en vóó...

Страница 29: ...itgevoerd 2 De condensafvoer wordt belemmerd OPLOSSING 1 Schakel de stroom in 2 Vraagomtussenkomstvandeassistentiedienst 3 Start de machine door de schakelaar op I te zetten 4 Open de FLAP 1 Reinig het luchtfilter 2 Vraagomtussenkomstvandeassistentiedienst 3 Verwijder het obstakel 4 Vraag om tussenkomst van de installateur 5 Sluit de deuren en of de ramen 6 Selecteer de gemiddelde of de maximumsne...

Страница 30: ...szerelését és beindítását erre FIGYELEM az egység beszerelését és beindítását erre FIGYELEM az egység beszerelését és beindítását erre FIGYELEM az egység beszerelését és beindítását erre engedéllyel rendelkező személynek kell elvégeznie a gépészeti engedéllyel rendelkező személynek kell elvégeznie a gépészeti engedéllyel rendelkező személynek kell elvégeznie a gépészeti engedéllyel rendelkező szem...

Страница 31: ...ön meg arról hogy a dőlés elegendő a kondenzvíz helyes lefolyásának biztosításához Figyelem ne használjon nagyon vastag csövet vagy olyantulajdonságokkalrendelkezőcsövet pl bordáselektromosszigetelő burkolatok amelyekakadályozzákalefolyást Ajánlatos a berendezés bemeneti ágát a hőcserélő alsó részén míg a visszatérő ágát a felső részen elhelyezni Végezze el a hőcserélő légtelenítését a megfelelő l...

Страница 32: ...lőlégrácsait nemtömítetteelvalamiféleszennyeződés Időszakonkéntvégezzeelatisztításátsűrítettlevegővel vagyalacsony nyomású gőzzel de ügyeljen arra hogy a rácsok ne sérüljenek meg A megfelelő és időszakonkénti karbantartás A megfelelő és időszakonkénti karbantartás A megfelelő és időszakonkénti karbantartás A megfelelő és időszakonkénti karbantartás A megfelelő és időszakonkénti karbantartás energi...

Страница 33: ...aszervizszolgálatot 3 Indítsa be a berendezést a kapcsolót tegye 1 es állásba 4 NyissakiaFLAP et terelőlemezt 1 Tisztítsamegalégszűrőt 2 Kérje a beszerelő segítségét 3 Távolítsaelazakadályt 4 Kérje a beszerelő segítségét 5 Zárja be az ajtókat és vagy ablakokat 6 Válassza ki a közepes vagy a maximális sebességet 1 Kérje a beszerelő segítségét 2 Kérje a beszerelő segítségét 9 9 9 9 9 HIBÁK AZONOSÍTÁ...

Страница 34: ...34 FC66001820 00 È severamente vietata la riproduzione anche parziale di questo manuale All copying even partial of this manual is strictly forbidden FLAT 1 2 3 6 5 4 7 8 9 10 11 12 13 14 1 ...

Страница 35: ...FC66001820 00 Èseveramentevietatalariproduzioneancheparzialediquestomanuale Allcopying evenpartial ofthismanualisstrictlyforbidden FLAT 35 1 2 3 6 5 8 9 11 12 13 14 7 10 4 2 ...

Страница 36: ...questo manuale All copying even partial of this manual is strictly forbidden FLAT L A 143 143 39 158 185 195 253 146 258 449 551 308 93 150 213 304 453 92 185 233 FLAT 10 20 30 40 50 60 70 A mm 534 534 704 704 874 874 874 L mm 820 820 990 990 1160 1160 1160 3 4 5 12 12 12 6 ...

Страница 37: ...FC66001820 00 Èseveramentevietatalariproduzioneancheparzialediquestomanuale Allcopying evenpartial ofthismanualisstrictlyforbidden FLAT 37 230V 1 50Hz 1 9 10 11 12 7 8 ...

Страница 38: ...38 FC66001820 00 È severamente vietata la riproduzione anche parziale di questo manuale All copying even partial of this manual is strictly forbidden FLAT ...

Страница 39: ...FC66001820 00 Èseveramentevietatalariproduzioneancheparzialediquestomanuale Allcopying evenpartial ofthismanualisstrictlyforbidden FLAT 39 ...

Страница 40: ...i ed alla manodopera necessaria per la riparazione sono a carico del cliente 6 Come specificato dai termini di legge DL 199 l obbligo della garanzia all utilizzatore finale è a carico del venditore la società presso la quale ha effettuato l acquisto Galletti attiverà le procedure di garanzia su richiesta del venditore 7 La garanzia Galletti non copre Controlli manutenzioni riparazioni dovuti a nor...

Отзывы: