96833 v.2.0
23
Banks iQ performance testing allows
the user to run a
1
/
8
mile,
1
/
4
mile, or a
0-60 MPH test run.
Setting up for Performance
Testing
1.
Press the ‘Performance’ button in
the ‘Environment Select’ menu. The
Performance Screen will appear. See
Figure 19
.
2.
Banks iQ lets you change any of the
gauges on view in the Performance
display. changing the displayed gauges
does not affect the measurements
actually being recorded during the
test. If you would like to change these
gauges, simply press the gauge you
want to change and you will be taken
to the Gauge Placement menu. See
Section 19
.
3.
Select the performance test you want
to run: ‘0-60 MPH’, ‘
1
/
8
Mile’, ‘
1
/
4
Mile’.
See
Figure 20
.
4.
Adjust the Power Level on the left
if desired.
5.
Press the ‘Start Test’ button.
NOTE: To ensure accuracy, the vehicle
must be completely stopped when
pressing the ‘Start Test’ button.
After
pressing the ‘Start Test’ button, the
Banks iQ will immediately arm itself
and wait for vehicle motion to begin
recording.
6.
The “christmas Tree” Yellow Light
will flash.
7.
Test begins when Green Light
flashes on and accelerator pedal is
pushed.
NOTE: You can begin the test any time
after the ‘Start Test’ button is pressed
by pushing on accelerator pedal or
making the wheels roll.
Recommended Performance Test
Procedure:
A
.
Foot firmly on brake, vehicle at
rest, select drive gear.
B
.
Select the desired ‘Performance
Test’.
C
.
Press ‘Start Test’. Wait for green
light.
D
.
Test begins once vehicle motion
is detected.
Section 9
PERFORMaNCE ENVIRONMENT
Figure 20
Start Test
Содержание Banks iQ
Страница 12: ...12 96833 v 2 0 Figure 5 Banks iQ System Figure 6 Banks Bridge Module...
Страница 32: ...32 96833 v 2 0 Figure 31 Figure 32 Figure 30...
Страница 34: ...34 96833 v 2 0 Figure 34 Figure 35 Figure 33...
Страница 50: ...50 96833 v 2 0 Notes...
Страница 51: ...96833 v 2 0 51 Notes...