Call/Send Station
1.
Disconnect the electricity going to the lift.
2.
Remove the four screws that secure the gel pad to the control box. BE CAREFUL The connector and ribbon are
fragile and will be very difficult to successfully reattach. The Gel pad can be placed in the side of the control box
while attaching the wires.
3.
Find the blue screw terminals located near the Gel Pad connector as shown in figure 18 below.
4.
Connect the wires from the call send station as shown in the figure below.
Note that the uncolored terminal
furthest to the left is not used in this application.
5.
Reinstall Gel Pad. Route the ribbon cable so that it does not kink sharply.
6.
Reconnect power to the Galaxy control box and test.
Figure 18. Call Send Station Wiring Terminal
Содержание 1M2S
Страница 1: ...1M2S Control Box Wiring Programming Guide...
Страница 5: ......
Страница 6: ...240 Volt standard Lift Wiring...
Страница 8: ...120 Volt Standard Lift Wiring...
Страница 11: ......
Страница 14: ...Limits CB...
Страница 16: ...Additional Equipment Setup Section Not Standard Call Send...
Страница 20: ......