background image

Talano & Alera Installation v2.6 

Gainsborough Bathrooms

 

Gainsborough House

 

Brickyard Road

 

Aldridge WS9 8SR

 

United Kingdom

 

Tel: +44 (0)1527 400022

 

email

[email protected]

  

 

www.gainsboroughbaths.com

 

 

 

TALANO & ALERA  

 

INSTALLATION MANUAL

 

Содержание TALANO

Страница 1: ...lation v2 6 Gainsborough Bathrooms Gainsborough House Brickyard Road Aldridge WS9 8SR United Kingdom Tel 44 0 1527 400022 email service gainsboroughbaths com www gainsboroughbaths com TALANO ALERA INS...

Страница 2: ...ll floor finishes should be in place prior to installation i e Altro Tiling Items supplied with the Bath Installation manual User manual Bath unit bath shell support frame control pack Bath surround p...

Страница 3: ...th to floor Feet frames MUST be level and vertical Use a spirit level Utilise shims if required Connect bath to temporary power supply Connect handset and power up bath Place bath into position Connec...

Страница 4: ...acity 230 200 litres Approximate Bath Weight Empty 119Kg 115Kg Power Supply Mains 230V to be supplied via 30mA RCD Operating Voltage 24V Battery Backup Yes Water Supply Hot Cold water at 1 bar minimum...

Страница 5: ...ximum Water Capacity 230 200 litres Approximate Bath Weight Empty 130Kg 125Kg Power Supply Mains 230V to be supplied via 30mA RCD Operating Voltage 24V Battery Backup Yes Water Supply Hot Cold water a...

Страница 6: ...cing see figure 4 0 for further details 2 Offer the bath into position making sure that the floor is of a sound solid surface If the floor slopes i e wet room installation with a centre drain shims sh...

Страница 7: ...Wood Floorboard M10 x 50 Nylon Plug Type E 4 M8 Form C Washer BZP 4 Figure 5 1 4 With the bath in position mark the floor where it is to be drilled See Figures 4 1 4 2 for dimensional information A T...

Страница 8: ...plicable junction boxes should be fitted underneath the bath and affixed using a mechanical tool screw or similar Ensure that a suitable location is chosen i e positioned off the floor and behind bath...

Страница 9: ...thickness Once fitted the side panel can be clipped into position Further work may be required before the end panels can be fitted see step 12 Figure 7 0 Affix wooden battens to the floor to prevent...

Страница 10: ...on Addendum Head End Base Plate Figure 7 0 Please take note of the floor fixing locations illustrated on the base plate diagram Precautions should be taken to investigate floor integrity paying partic...

Страница 11: ...Talano Alera Installation v2 6 11 Installation Addendum...

Страница 12: ...Talano Alera Installation v2 6 12 Installation Addendum...

Страница 13: ...the bath and will then stop Press Seat out which will bring the seat down and out do not use until the fault is rectified Once power is restored allow the batteries to recharge before operation usuall...

Отзывы: