background image

9

L20

L19B

L19A

L19A

J

J

J

J

1

1

2

2

L20

J

L19A

J

L19A

L19B

1

2

Push down the button on 
connector J before inserting it 
into the end of the frame profile.

After connector J has been fitted, 

use the hole in the profile to tighten 

the connector in place.

Содержание GM37405

Страница 1: ...MODEL GM37405 PRODUCT SIZE LxWxH 320x392x250cm PLEASE READ CAREFULLY BEFORE ASSEMBLY Greenhouse GM37405 Assembly instructions www ttshop se...

Страница 2: ...bly Advice Page 1 2 Product Features Page 2 3 3 Part Lists Page 4 7 4 Roof Vents Assembly Page 8 12 6 Doors Assembly Page 13 19 7 Base Assembly Page 20 21 8 Framework Assembly Page 22 43 9 Panels Asse...

Страница 3: ...OT climb or stand on the roof Heavy articles should not be leaned against the greenhouse 5 Keep the roof and gutter clear of snow dirt leaves Allowing snow to build up on the roof may damage the produ...

Страница 4: ...ments The hollow box profile aluminium framing is much stronger than other greenhouses and it can withstand much greater pressure Wind resistance up to 12th typhoon 40M S or 120KM H Weight Support 80K...

Страница 5: ...an collect rainwater 7 Remove approximately 2 inches of film from all sheet edges before installing and remove all film immediately after the construction is completed Please ensure that the side with...

Страница 6: ...GM37405 4 ALU Box No 1 ALU Box No 1 L26A 2 L26B L26C 2 4 L01B 2 L06 1 L07 1 D 1 E 1 F 1 G 1 L08A 2 L08B L10 A B J01 1 1 2 2 4 PART NO QTY L01A 2 L01C 2 L09 1 L14 1...

Страница 7: ...3C 24 L23D 12 L23A 5 L02A 3 L23N 2 L02K 16 L24A 16 L25A 2 L25B 2 L25C 2 L25D 2 L25E 2 L25F 2 L25G 2 L25H 2 L24D 1 L24E L24F L24G L24H L24I 1 1 1 1 1 L24B L24C 2 6 PART NO QTY L02D 1 L02E L02F L02G L02...

Страница 8: ...4 W08 2 10 4X14D Z02 S01 M6X12 9 Z 4 M03 M6 9 W03 2 J02R L 1 1 J03R L 1 1 J06 2 J07 2 J08 2 2 4X14 Z01 J05 2 W06 2 Windowx2pcs PART NO QTY L13 1 L16A 8 L17 2 L18A 2 L16B 8 L18B 1 L18C 1 L18D 4 PART N...

Страница 9: ...RT NO QTY Y1 1 Y2 8 Y3 1 Y4 1 Y7 8 Y6 6 Y5 1 Y4 Y2 Y8 Y2 Y13 Y2 Y15 Y2 Y4 Y2 Y8 Y2 Y13 Y2 Y15 Y2 Y6 Y6 Y6 Y6 Y6 Y6 Y11 Y11 Y11 Y11 Y7 Y7 Y7 Y7 Y7 Y7 Y7 Y9 Y7 Y9 Y10 Y10 Y8 1 Y9 2 Y10 2 Y11 4 Y13 1 Y14...

Страница 10: ...PART NO QTY L19A 4 L19B 2 L20 2 L11F 4 L11G 4 W06 2 J 8 8 L20 L19B L19A L19A B B B B Y10 L11F L11F L11G L11G W06 4 Z03 4X10 Y10 2 L15A 2 4 4X14D Z02 L15A Roof Vents Assembly 2PCS...

Страница 11: ...J J 1 1 2 2 L20 J L19A J L19A L19B 1 2 Push down the button on connector J before inserting it into the end of the frame profile After connector J has been fitted use the hole in the profile to tighte...

Страница 12: ...10 L11G L11G L11F L11F Y10 Y10 First the glazing panel Y10 should be loosely retained by the bar capping profiles L11F and L11G Next tap the bar capping gently into position with a rubber mallet...

Страница 13: ...11 Z03 Z03 W06 Y10 Y10 Fix the W06 vent handles using Z03 screws...

Страница 14: ...12 Y10 L15A Z02 1 2 Z02 L15A 2 1 2 Fill the gap with silicone sealant on 4 sides to avoid any leaking...

Страница 15: ...PART NO QTY L13 1 L16A 8 L17 2 L18A 2 L16B 8 L18B 1 L18C 1 L18D 4 PART NO QTY 8 PART NO QTY Y11 4 8 4X40 Z04 D 4 S02 4 M8X30 M02 M8 4 13 L11H 8 L11J 8 J Door Assembly...

Страница 16: ...6A then assemble the door frames using connector J as shown in the sketches below Put L16A into L17 and L18D and put L16B into L18A and L18B Push down the button on connector J before inserting it int...

Страница 17: ...1 Y11 L11H L11H L11H L11H L11J L11J Y11 Y11 First the glazing panels should be loosely retained by the bar capping profiles L11H and L11J Next tap the bar capping gently into position with a rubber ma...

Страница 18: ...3 After Assembly Slide 2xS02 into L18D positioned 100mm away from each edge Secure S02 using M02 bolts then rotate the wheels to ensure free movement 14 4mm L13 L13 14 4mm Attention make sure you leav...

Страница 19: ...or then assemble the door frames using connector J as shown in the sketches below Put L16A into L17 and L18D and put L16B into L18A and L18C Push down the button on connector J before inserting it int...

Страница 20: ...1 Y11 Y11 Y11 L11H L11H L11H L11H L11J L11J First the glazing panels should be loosely retained by the bar capping profiles L11H and L11J Next tap the bar capping gently into position with a rubber ma...

Страница 21: ...mm 29mm 29mm 1 1 1 1 After Assembly This is the method of adjusting the door height Slide 2xS02 into L18D positioned 100mm away from each edge Secure S02 using M02 bolts then rotate the wheels to ensu...

Страница 22: ...a b a b a b a b 20 It is essential the dimensions a b are the same to ensure the base is square Expansion bolt in concrete Steel pegs in soil or wood Support at the corners only is inadequate...

Страница 23: ...O QTY S03 14 M8X60 W05 14 3022mm 3790mm 4 8 4 7 3 m m 4 8 4 7 3 m m 325 768 768 768 325 325 1536 1536 325 325 768 768 768 325 325 768 325 This size is the inner specification of the product Expansion...

Страница 24: ...profiles connectors and anchor brackets approximately in place Make sure you pay close attention to the direction of the pins B A Assemly L08A L08B and L10 with connecter A and B Insert connector A B...

Страница 25: ...L10 L01A A J01 1 2 3 4 PART NO QTY L01A 2 L01C 2 Make sure you pay close attention to the direction of the pins Assembly L01A L01C with connector A B insert connector A B into L01A L01C tight the bolt...

Страница 26: ...spanner when they are in right positions Then connect them to L01C using the other end of connector G F tight the bolts when they are in right positions Install L01B and L07 using connector D E insert...

Страница 27: ...L26C L26C L26A L26B L26A L26B L26C L06 L01C L01C L01C L01C L08A L08B L10 PART NO QTY L26A 2 L26B L26C 2 4 Please pay attention to the direction Tap the bar capping L26A into L01C L26B into L08A and L2...

Страница 28: ...L23C 8 L24B L24C 2 6 L23C L23C L24B L24C L24B L24C L01B L01B L08A L08A Tap the bar capping L24C L24B into L01B gently with a rubber mallet Make sure you leave 51mm between each two L24C or L24C and L...

Страница 29: ...6 L02E L02F L02G L02H L02I 1 1 1 1 1 L08A L01B L01B Put connector K into the slot of L08A and M into the slot of L01B turn their direction until they go into the holes on L02D L02E L02F L02G L02H L02...

Страница 30: ...L24F L24H L02D E F G H I PART NO QTY L24D 1 L24E L24F L24G L24H L24I 1 1 1 1 1 L24D L24F L24H L24E L24G L24I Tap the bar capping L24D into L02D L24E into L02E L24F into L02F L24G into L02G L24H into...

Страница 31: ...2 L25D 2 L25E 2 L25F 2 L25G 2 L25H 2 L24A L24A L25H L25F L25D L25B L25H L25F L25D L25B L25G L25E L25C L25A L25G L25E L25C L25A Tap the bar capping L24A L25A L25B L25C L25D L25E L25F L25G and L25H int...

Страница 32: ...K L02K L02K L01A L01C L02E L02G L02I L02D L02F L02H Put connector K into the slot of L01A L01C L02D L02E L02F L02G L02H and L02I turn their direction until they go into the holes on L02K Tight the bol...

Страница 33: ...07 L10 PART NO QTY L23C 6 L23N 2 L23C L23C L23N L23N L23C L10 L07 Tap the bar capping L23C and L23N into L10 and L07 gently with a rubber mallet Make sure you leave 50mm between the two L23C or betwee...

Страница 34: ...N L23N E L10 1 2 L07 L02A K PART NO QTY L02A 3 K 6 Install L02A 3PCS Put connector K into the slot of L07 and L10 turn its direction until it goes into the hole on L02A Tight the bolt in the connecto...

Страница 35: ...33 L23A L23A L23A L23A L02A PART NO QTY L23A 3 Tap the bar capping L23A into L02A gently with a rubber mallet...

Страница 36: ...A L01A L02A 50mm 50mm L23D L23D L02B L01B L01B 50mm 50mm 50mm 50mm 50mm 50mm PART NO QTY L23A 2 L23D 12 Tap the bar capping L23A and L23D into L01A and L02A gently with a rubber mallet Make sure you l...

Страница 37: ...K L02K L02K L02K PART NO QTY L02K 3 K 6 Put connector K into the slot of L01A and L02A turn its direction until it goes into the hole on L02K Then tight the bolt in the connector K with the spanner S...

Страница 38: ...50mm 50mm L23CX10pcs L06 L07 L07 L06 PART NO QTY L23C 10 L23C L06 L07 Tap the bar capping L23C 10PCS into L06 and L07 gently with a rubber mallet Make sure you leave 50mm between the two L23C in the m...

Страница 39: ...C L07 K 1 2 L06 L02B K L23C 1 2 L02B 4 K 8 Install L02B 4PCS Put connector K into the slot of L06 and L07 turn its direction until it goes into the hole on L02B Then tight the bolt in the connector K...

Страница 40: ...38 L23B L23B L23B L23B L02B L23B PART NO QTY L23B 4 Tap the bar capping L23B into L02B gently with a rubber mallet...

Страница 41: ...m m 50m m 50m m 50m m 50m m 50m m 50m m L01B L01B L02B 50mm 50mm L23E F L23E L02A L02B L01B L01B PART NO QTY L23E 16 L23F 4 Tap the bar capping L23E and L23F into L01B and L02B gently with a rubber ma...

Страница 42: ...K L23E L02E F K PART NO QTY L02K 5 K 10 Assembly L02K Put connector K into the slot of L01B and L02B turn its direction until it goes into the hole on L02K Then tight the bolt in the connector K with...

Страница 43: ...23C L23C L23C L23C L23C L23C L23C L23C L23C L23C L23C L23C L23C PART NO QTY L23C 16 L23C L02K Tap the bar capping L23C into the corresponding aluminium profiles gently with a rubber mallet as shown ab...

Страница 44: ...onnector K into the slot of L02B turn its direction until it goes into the hole on L02K Then tight the bolt in the connector K with the spanner Make sure L02K must connect to L23F closely Slide in Tig...

Страница 45: ...cut 42mm 338mm 338mm W10 Attention If you install automatic openers please cut L23C into 2pcs Length 338MM PC Tap them into L02K gently with the a rubber mallet and leave 42mm space for W10 Tap the ba...

Страница 46: ...12F Y2 4 L11A 1 L11C 1 L11D 4 1 L12H 4 L12K Y1 1 Y3 1 Y5 1 Y14 1 Y3 L11B L11A L12D L12F L12H L12K L12K L12K L12K L11C L11D L11D L11D L11D Panel Assembly Install the panels and aluminum bar capping in...

Страница 47: ...L12I L12K L12K L12K L12K L11C L11D L11D L11D L11D 1 1 2 3 4 5 5 9 9 13 13 6 7 8 10 11 12 14 15 16 17 18 L11D 4 1 L12I 4 L12K Y4 1 Y8 1 Y13 1 Y15 1 Install the panels and aluminum bar capping in order...

Страница 48: ...2A L12K L12K L12K L11E L11E L11D Y6 Y6 Y6 Y6 Y6 Y6 L11A L11A L12A L12A L12K L12K L12K L11E L11E L11D Y7 Y7 L11A 2 L11E 2 Install the panels and aluminum bar capping in order as shown above tap these b...

Страница 49: ...Y7 Y7 Y7 Y9 Y9 L12K L12K L12K L12K L12K L12K L12K L09 L11B L11B L12B L12B L12B L12B L09 1 Y9 2 Install the roof panels and aluminum bar capping in order as shown above tap these bar capping into the...

Страница 50: ...48 Fill the silicone sealant on the places shown above to avoid any water leaking...

Страница 51: ...Z03 Slide the window vent along the groove in the L06 and fix it in the correct position using Z02 screws S01 Z Use a screw S01 to pass over Part Z and then put part Z 2pcs into the slot of L07 turn...

Страница 52: ...3 L14 Door M03 M01 Use a bolt S01 to pass over W12 and then slide W12 2pcs into the channel of L14 fix them using W13 and M03 loosely Rotate D the roller wheels to adjust the height of the door so it...

Страница 53: ...51 PART NO QTY W03 2 6 4X14D Z02 1 1 2 2 J03R L J02R L W03 Z02 1 2 J02R L 1 1 J03R L 1 1 Install the anchor brackets J03R L and J02R L using screw Z02...

Страница 54: ...e in L01A and L01B approximately 3 2mm diameter and 700mm up from the bottom Fix the J08 downpipe bracket with Z01 screws and then clip the J06 downpipe into the J08 bracket Fill some silicone sealant...

Отзывы: