34
L23D
L23D
L23D
L23D
L23D
L23D
L23A
L23D
L23D
L23D
L23A
L02A
L02A
L02A
L01A
L02A
50mm
50mm
L23D
L23D
L02B
L01B
L01B
5
0mm
5
0mm
5
0mm
5
0mm
5
0mm
5
0mm
PART
NO
QTY
L23A
2
L23D
12
Tap the bar capping L23A and L23D
into L01A and L02A gently with a
rubber mallet. Make sure you leave
50mm between the two L23D in the
middle,for later assembly of L02K.
Содержание GM37405
Страница 13: ...11 Z03 Z03 W06 Y10 Y10 Fix the W06 vent handles using Z03 screws...
Страница 14: ...12 Y10 L15A Z02 1 2 Z02 L15A 2 1 2 Fill the gap with silicone sealant on 4 sides to avoid any leaking...
Страница 35: ...33 L23A L23A L23A L23A L02A PART NO QTY L23A 3 Tap the bar capping L23A into L02A gently with a rubber mallet...
Страница 50: ...48 Fill the silicone sealant on the places shown above to avoid any water leaking...