Installation of the Drain Hose
4
Electrical Connection
Remove the drainage tray and connect the
corrugated hose, supplied with the machine,
to the drainage tray outlet (see figure), before
finally connecting the other end to the general
drainage system of the establishment.
It is important that the drain hose is com-
pletely straight and does not hang loose to
enable good drainage.
Connect the machine to a suitable connection,
in line with the current electrical regulations.
Connect the machine according to the mains
voltage of the stablishment as indicated on
the label attached to the instalation cable, see
figure a).
You should not use any type of extension
cords or power strips to connect the ma-
chine to the power supply.
The power connection cable should never
be rolled up, but instead should be fully
extended to prevent possible overheating.
5
Operation
6
Purging the Group Heads
Press the main switch, located at the base of the
machine. When the machine switches on, the
switch will light.
After switching on, the electronic control unit
defects that there is no water level in the boi-
ler, activating the solenoid valve and the
pump, which both remain active until the level
gauge dectects the correct water level.
During that process, the action lights (under
the touch pads) will light front left to right re-
peatedly. When finished, the boiler heating
element will then be activated,, heating the
hole system.
If the control unit does not detect water
level in the boiler for a certain duration, all
the LEDs of the programmable buttons will
flash continuously. The alarm will disap-
pear with the turning off and subsequent
turning on of the machine. (see section 6,
page 29).
7
While the machine heats up, install the grin-
der and adjust the grind fineness and dosing.
8
Once the machine has reached working tem-
peratura and you have adjusted the grind fi-
neness, you can program the coffee dosing
(see section 3.3, p. 24).
Place the portafilter in the brew group and press
the continuous coffee button to purge the group
head; let the water flow for around 30 seconds.
Wait until the machine reaches working tem-
perature, checking that the gauge shows 1
bar pressure in the boiler.
The Main Switch is loca-
ted on the lower right part
of the machine, near the
front foot.
i
Figure a)
Étiquette de
raccordement
i
1 Bar Working
Pressure
i
Drainage
Tray Outlet