background image

1. FP-4DN, FP-5DN, FP-6DN and FP-5 Transmitters are equipped with a built-in transformer-type charger for

maximum safety and provided with 8/450 mAH Nickel Cadmium Batteries for dependable operations.

2. With the antenna firmly in place, turn the switch on and the Meter needle will point to 10 or more on the Dial.

This is an indication that a Radio signal is being radiated. If the meter needle does not move, check for a pos-
sible bad connection in the power supply unit.

3. When the meter needle points below 10, this indicates that the battery is not sufficiently charged.

4. Please be aware that whenever the meter needle falls below 10, the area covered by the signal is diminished.

5. Along side and below each control sticks are two (2) small Black levers. These allow "trim" of all four main

controls. You can adjust (Trim) these levers for fine adjustments for all four (4) operations such as throttle,
ailerons, elevators and rudder.

6. FREQUENCIES - Available in MHz.

(Available Futaba pair crystal Tx/Rx)

27 MHz Areas

26.995 (Brown)
27.045 (Red)
27.095 (Orange)

27.145 (Yellow)
27.195 (Green)

72 MHz Areas.

* 72.080 (Brown/White)

72.160 (Blue/White)

* 72.240 (Red/White)

72.320 (Violet/White)

* 72.400 (Orange/White)

72.960 (Yellow/White) (**)

* 75.640 (Green/White) (**)

Remarks: Mark * = Model Aircraft use only.

Mark (**) = Factory tuned convertion of crystal is required.

5

Содержание FP-4DN

Страница 1: ...New FUTABA DIGITAL PROPORTIONAL RADIO CONTROL...

Страница 2: ...INDEX Features 1 Specifications 2 Transmitter operation 3 Handling the Receiver Servos 6 Ni cads batteries re charging 8 Preca tions test installation 9 Guarantee 12 Factory repair service 13...

Страница 3: ...spurious signals by utilization of a double tuned RF pre selector circuit 6 Shielded RF and Oscillator coils provide strong rejection of spurious signals 7 Accidental touching of Futaba Transmitter an...

Страница 4: ...ype control is added on the front panel for the 6th control variable move ment Operating procedures for the FP 4DN FP 5DN FP 6DN are the same as they are designed and Manufactured to the same specific...

Страница 5: ...Transmitters are shown in the Diagram below and it is suggested that the manipu lation of these controls be well mastered FP T4D for FP 4DN 4 CHANNEL FP T5D for FP 5DN 5 CHANNEL FP T6D for FP 6DN 6 CH...

Страница 6: ...ciently charged 4 Please be aware that whenever the meter needle falls below 10 the area covered by the signal is diminished 5 Along side and below each control sticks are two 2 small Black levers The...

Страница 7: ...ceiver 3 The Block Connector sockets are po larized and each position is designated on the receiver case Therefore check carefully before connecting the Servos Particularly care must be taken since th...

Страница 8: ...ve each stick and Trim lever and check to see if the specific Servo is actuated correctly 9 When each section is tested for movement please make certain that both the Transmitting and Receiving antenn...

Страница 9: ...ghtly exceeded When Ni Cad batteries are completely charged you can ordinarily expect about 100 minutes of use during a given day about 10 control sessions of 10 minutes each Normally Ni Cad batteries...

Страница 10: ...to its shortest length and with the receiver antenna in extended condition if the controls functions properly at the distance of 50 to 100 feet the system is operating normally However it should be ca...

Страница 11: ...is plugged in completely Always re check the installation of the Servo Horns and Rods to make sure that their motion matches the move ment of the Transmitter control stick Use the reversible Servo FP...

Страница 12: ...e signals enter the receiver unex pected movements of the Servos can result Therefore one of the metal surfaces touching each other should be covered with an insulating material 6 When the installatio...

Страница 13: ...R C system has been improperly handled damaged in a crash or tampered with The guarantee does not cover the replacement of Plastic Housings or Electronics components by the use of improper voltage In...

Страница 14: ...ly with sufficient packing material to prevent shipping dam age 5 Include a brief but thorough explanation of all problems and service required and tape to back of transmitter Label servos as to their...

Страница 15: ......

Отзывы: