2. WIRING
2-49
2.8
Intelligent HUB HUB-3000 (option)
Fix the LAN cable connected to the cable clamp using the cable ties (supplied).
No use.
Power port
Power Fail
LAN port
Ground wire
(IV-1.25sq., supplied)
DPYC-1.5 cable
DPYC-1.5 cable
to gateway network (ECDIS, radar, etc.)
Attach the LAN cap (supplied) to the unused connector
holes to provide waterproofing standard IPX2.
LAN cable
Cable clamp
Содержание FCR-2829W
Страница 14: ...EQUIPMENT LISTS xii This page is intentionally left blank ...
Страница 88: ...2 WIRING 2 54 This page is intentionally left blank ...
Страница 154: ...D 1 Y Hatai ...
Страница 155: ...D 2 14 Feb 2011 Y NISHIYAMA ...
Страница 156: ...D 3 16 Jun 2011 Y NISHIYAMA ...
Страница 157: ...D 4 Y Hatai ...
Страница 158: ...May17 07 R Esumi D 5 ...
Страница 159: ...13 Feb 2014 H MAKI D 6 ...
Страница 160: ...D 7 24 May 2012 Y NISHIYAMA ...
Страница 161: ...D 8 24 May 2012 Y NISHIYAMA ...
Страница 162: ...D 9 24 May 2012 Y NISHIYAMA ...
Страница 163: ...D 10 ...
Страница 164: ...D 11 ...
Страница 165: ...D 12 ...
Страница 166: ...D 13 12 May 2015 H MAKI ...
Страница 169: ...13 Jan 2012 Y NISHIYAMA 西山義浩 D 16 ...
Страница 170: ...13 Jan 2012 Y NISHIYAMA D 17 ...
Страница 171: ...D 18 ...