3-1
CHECKS AND ADJUSTMENTS
3.1 General Checks
Check on slipway or in drydock
No.
1
2
3
4
Check item
Retraction tank
Clearance between trans-
ducer and bottom of re-
traction tank when trans-
ducer is completely
retracted by hand crank.
Transducer travel
(lowered by hand crank)
Note: Clearance under
bootom of the transducer
should be approx. 1 meter
in order to check.
Transducer heading
1-2
1-2
D-8
D-7
1-6
On-keel installation
Off-keel installation
Bow mark inscribed on main shaft should
face ship's bow.
Flush with keel
Within 1 m
Approx. 1 cm
Min. 30 cm
BOW
mark
Result
Ref. page
Rating
Содержание CSH-7
Страница 1: ...COLOR SCANNING SONAR MODEL CSH 7 ...
Страница 4: ...ii ...
Страница 6: ...iv SYSTEM CONFIGURATION ...
Страница 15: ...1 8 ...
Страница 16: ...1 9 ...
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......