![Furukawa electric S178 Скачать руководство пользователя страница 74](http://html1.mh-extra.com/html/furukawa-electric/s178/s178_user-manual_2349550074.webp)
Operating Instructions
6-2
6.2. Fusion Splicing
Once the arc check function is performed and correct programs are selected, the complete
fusion splicing cycle can be initiated from the READY screen.
6.2.1. Preparing the Fiber
Splice loss is directly affected by the quality of the fiber preparation. For best results, ensure that
the V-grooves are clean and that the fiber ends are properly cleaned and cleaved.
1. Slide a splice protection sleeve onto either the right or the left fiber.
Protection sleeve
Insert
Fiber
Содержание S178
Страница 2: ......
Страница 3: ......
Страница 22: ......
Страница 40: ...External Description 4 2 Electrode V Groove Fiber Holder Fiber Clamp...
Страница 49: ...External Description 4 11 Function Menu Function Keys Press to select the corresponding Function Menu...
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 56: ...Getting Started 5 4 1 Pull the Battery Door Lock 2 Lower the Battery Door a little 3 Open the Battery Door Lock...
Страница 72: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 124: ...Programming Guide 8 20 Time chart of heater parameters...
Страница 157: ...Option 9 3 9 3 Cleaning Brush VGC 01 It is used to remove the garbage that adheres to V groove and the fiber clamp...
Страница 161: ...For sales and service information contact FURUKAWA ELECTRIC CO LTD or your local representative...