FULTON FB-W 012 Скачать руководство пользователя страница 13

Questions?  Call (315) 298-5121, or visit us online at  www.fulton.com

SECTION 2

 

FBW-IOM-2014-0311

 

INSTALLATION

2-7

 

!

WARNING

Ensure all labels on the boiler are 
legible. All connections and safety 
devices, both mechanical and 
electrical, must be kept clean, with 
ease of access for inspection, use and 
maintenance.  

Do not store or use gasoline or other 
fl ammable vapors and liquids or 
corrosive materials in the vicinity of 
this or any other appliances. 

equipment.  

2.  Install the water safety valve into the opening on the boiler, piping the 

outlet of the valve to a safe blow-off  point.

 NOTE: 

Unless otherwise specifi ed, the safety valve supplied with the boiler 

is pre-set.  This valve is provided as a safety device for the boiler and should 
not be used as the sole protection for other equipment.

3.  Install the water temperature / pressure gauge assembly. 

4.  The drain valve is connected to the lowest opening at the bottom rear of 

the boiler.  Pipe from the outlet of the valve to a safe drain point.  Provision 
should be made to allow easy access to the drain valve. 

Electrical Installation

Adhere to the following for electrical installation:

1.  Connect wiring as shown in wiring diagram which is furnished inside the 

electrical control panel. Be sure to install a fused switch for the contactors 
and a separate fused switch for the circulating pump(s).  

2.  A correctly sized fused disconnect should be fi tted as close to the boiler as 

possible and connections made to the boiler panel in compliance with NEC 
(National Electrical Code) and local codes.

3.  Typical 120VAC controls allow for a +10% and a -15% voltage fl uctuation.

 

Motors

1.  Motors are designed to operate within the following limits at the motor 

terminals: 

 

AC power supplied is /- 10 % of the motor rated voltage with the 
rated frequency applied. OR 

 

AC power supplied is /- 5% of the rated frequency and with the 
rated voltage OR 

 

A combined variation in voltage and frequency of +/- 10% (sum of 
absolute values) of rated values provided the frequency variation does not 
/-5% of rated frequency. 

2.  For 3 phase motors, the line to line full load voltage must be balanced 

within 1% of the rated motor voltage. If the motor is rated 208-230V, the 
voltage deviations must be calculated from 230V. Operation outside of 
the above limits will degrade motor performance. 575V rated motors 
cannot be operated at voltages above 600V. Depending on the motor 
manufacturer, a 208V rated motor may not be able to run below the design 
voltage.

Содержание FB-W 012

Страница 1: ...INSTALLATIONAND OPERATIONMANUAL Electric HotWater Boiler FB W 12 to 700 kW 1 2 to 70 HP Serial National Board Model Fulton Order SoldTo Job Name Date FBW IOM 2014 0312...

Страница 2: ......

Страница 3: ...Control 2 5 STEPCONTROLLERS 2 5 WaterSupply 2 5 WATERQUALITY 2 5 WATERSPECIFICATION 2 5 ElectricalInstallation 2 7 MOTORS 2 7 ELECTRICELEMENTS 2 8 Operation 3 1 BeforeStartUp 3 2 Start Up 3 2 BoilerCo...

Страница 4: ...TheFultonCompanies2014 TABLEOFCONTENTS FBW IOM 2014 0311 0 2...

Страница 5: ...Questions Call 315 298 5121 orvisitusonlineat www fulton com 1 1 INTRODUCTION INTRODUCTION 1 INSTALLATION 2 OPERATION 3 MAINTENANCE 4 WARRANTY PARTS 5...

Страница 6: ...otes in literature on stickers and labels and any additional safety precautions that apply Follow all safety codes and wear appropriate safety protection Follow all jurisdictional codes and consult an...

Страница 7: ...Questions Call 315 298 5121 orvisitusonlineat www fulton com 2 1 INSTALLATION INTRODUCTION 1 INSTALLATION 2 OPERATION 3 MAINTENANCE 4 WARRANTY PARTS 5...

Страница 8: ...h element This results in low flux temperatures and long element life Multiple vertically oriented stainless steel or Incolloy elements discourage build up because element expansion and contraction ca...

Страница 9: ...UL requires at least 36 clear space be maintained in front of any electrical panel 3 Ensure all labels on the boiler will be fully visible for maintenance and inspection BoilerTrim Each boiler is sup...

Страница 10: ...0 20 20 20 20 20 17 17 24 24 28 28 36 40 40 44 44 50 50 MM 508 508 508 508 508 508 432 432 610 610 711 711 914 1016 1016 1118 1118 1270 1270 H Overall Depth Electric Panel to Drain IN 34 34 34 34 34 3...

Страница 11: ...s and dissolved minerals These materials may promote corrosion deposition and or fouling of equipment To prevent TABLE 1B SPECIFICATIONS Model FB W 012 015 018 024 030 036 050 070 105 140 175 210 280...

Страница 12: ...per less than 25 ppm Corrosion Inhibitor level capable of maintaining iron corrosion rates 2 mpy Due to changing environmental restrictions a non heavy metal all organic inhibitor is recommended which...

Страница 13: ...ect wiring as shown in wiring diagram which is furnished inside the electrical control panel Be sure to install a fused switch for the contactors and a separate fused switch for the circulating pump s...

Страница 14: ...c elements will have an increase in watt density if the applied voltage is higher than the element design voltage Therefore electric elements have a 0 tolerance for operation over design voltage Elect...

Страница 15: ...Questions Call 315 298 5121 orvisitusonlineat www fulton com 3 1 OPERATION INTRODUCTION 1 INSTALLATION 2 OPERATION 3 MAINTENANCE 4 WARRANTY PARTS 5...

Страница 16: ...ter level is too low A low water cut off condition will require pushing the manual reset button on the panel box Water Relief Valve ASME Approved releases extra pressure Water Outlet Valve allows wate...

Страница 17: ...he fused switch that controls the circulating pump should be kept in the on position at all times during the boiler operation as well as during the non operating period of the boiler This should be tu...

Страница 18: ...conduct and strict adherence to applicable jurisdictional professional codes and regulations Failure to follow instructions may result in a fire or explosion causing property damage personal injury o...

Страница 19: ...Questions Call 315 298 5121 orvisitusonlineat www fulton com 4 1 MAINTENANCE INTRODUCTION 1 INSTALLATION 2 OPERATION 3 MAINTENANCE 4 WARRANTY PARTS 5...

Страница 20: ...section of the manual DailyMaintenanceandInspectionSchedule Daily maintenance and inspection must include the following 1 Check all valves for proper opening and closing 2 Check supply water pump for...

Страница 21: ...oroughly clean the surface on boiler and on plate 2 Place neoprene gasket on handhole plate Be sure the gasket is pushed down tight on the plate Do not use any grease lubricant or adhesive 3 After pla...

Страница 22: ...verify power in each stage or that component is supplied 2 If part of the voltage is stopped at any point replace that component and continue the test until all circuits test clear Control Switch Fail...

Страница 23: ...ff an ohm meter can be used to check the contactor points between the contac tor supply and contactor feed to verify the contactor is pulling in A visual inspection on the side of the contactor can be...

Страница 24: ...TheFultonCompanies2014 MAINTENANCE FBW IOM 2014 0311 SECTION4 4 6...

Страница 25: ...Questions Call 315 298 5121 orvisitusonlineat www fulton com 5 1 WARRANTY PARTS INTRODUCTION 1 INSTALLATION 2 OPERATION 3 MAINTENANCE 4 WARRANTY PARTS 5...

Страница 26: ...lly completed and returned the equipment Installation and Operation Checklists to Fulton s Quality Assurance department General Fulton shall be notified in writing as soon as any defect becomes appare...

Страница 27: ...nd system performance and voids the product warranty Parts Spare and replacement parts may be ordered from your local representative or through the Fulton Companies When ordering replacement parts ple...

Страница 28: ...TheFultonCompanies2014 WARRANTY PARTS FBW IOM 2014 0311 SECTION5 5 4 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 29: ...Questions Call 315 298 5121 orvisitusonlineat www fulton com SECTION5 FBW IOM 2014 0311 WARRANTY PARTS 5 5 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 30: ...TheFultonCompanies2014 WARRANTY PARTS FBW IOM 2014 0311 SECTION5 5 6...

Страница 31: ......

Страница 32: ...nstallation Operation and Maintenance manual may be reproduced in any form or by any means without permission in writing from the Fulton Companies Fulton BoilerWorks Inc Fulton Heating Solutions Inc F...

Отзывы: