EP18-72-IOMM-2015-7
Fulton Ltd
Page 34
MAINTENANCE - 4
4.7.4
THREE MONTHLY
IN ADDITION
9. Drain the boiler (see
Section 3.5 - Draining The Boiler
).
10. Remove boiler elements (see
Section 4.4.1 - Element Removal
).
11. Visually inspect the internal water space of the pressure vessel (see
Section 4.5 - Boiler
Internal Inspection
).
12. Visually inspect each element and check for excessive scale build-up or corrosion. Clean
as required and replace, always use a new gasket (see
Section 4.4 Element Care and
Protection
).
13. Check and clean the feedwater strainer.
14. Check all electrical connections for tightness.
15. Remove and clean the boiler and feedwater tank level probes (see
Section 4.6 - Cleaning
Water Level Probes
).
Note: Ensure probe caps are reconnected to the correct probes.
16. Return all valves to normal working position.
17. Restore the boiler water level and reconnect the electrical supply.
Содержание Electropack EP18
Страница 2: ...EP18 72 IOMM 2015 7 Fulton Ltd Page II...
Страница 8: ...EP18 72 IOMM 2015 7 Fulton Ltd Page 2...
Страница 28: ...EP18 72 IOMM 2015 7 Fulton Ltd Page 22...
Страница 46: ...EP18 72 IOMM 2015 7 Fulton Ltd Page 40...