EN
11
QUALIFIED SERVICE MAN OR GAS APPLIANCE INSTALLER
MUST MAKE THE GAS SUPPLY CONNECTION.
Leak testing of the appliance shall be conducted by the installer
according to the instructions given.
You must install the supplied connection parts seen here in
this configuration to the main gas manifold on the appliance.
Issues arising from a failure to do so will not be covered by
warranty.
Do not install the pressure regulator backwards as the gas will
not flow correctly. Check that the arrow on the back points in
the direction of gas flow.
Parts required for connection from gas supply to regulator are
the responsibility of the installer / owner
Appliance
pressure regulator
Flare union
adaptor
Gasket
Appliance
ATTENTION
Use Teflon tape rated for gas applications at all threaded
connections.
Do not overtighten the connection at the manifold or you
could damage the gasket causing a leak.
WARNING
If the line pressure supplying the appliance pressure regulator
exceeds 14 inches W.C. (any gas), an external regulator
must be installed in the gas line ahead of the appliance
regulator to reduce the pressure to no more than 14 inches
W.C. Failure to do this can result in malfunction and damage
to the appliance.
Important Notes for Gas Connection
The appliance and its individual gas shutoff valve must be
disconnected from the gas supply piping system during any
pressure testing of that system at test pressures in excess of 1/2
psi (3.5 kPa).
The appliance must be isolated from the gas supply piping
system by closing its individual manual shut-off valve during
any pressure testing of the gas supply piping system at test
pressures equal to or less than 1/2 psi (3.5 kPa).
GAS SHUT OFF VALVE
OPEN POSITION
TO APP
LIANC
E
GAS S
UPPLY
All supply piping, except as noted, should use common
National Pipe Thread (N.P.T.). For all pipe connections use an
approved pipe joint compound resistant to the action of LP gas.
This appliance is designed for use with NG gas or LP gas.
The gas pressure regulator is supplied with this appliance.
It must be installed in the gas ahead of the manifold entrance.
It is pre-set for use with natural gas. To use it with different
gas it must be converted, as described in the Gas Conversion
paragraph.
If at any time the appliance is to be used with a different type
of gas, all the conversion adjustments must be made by a
qualified technician before attempting to operate the range
with that gas.
The gas should be supplied to the appliance’s pressure
regulator at line pressure between 6 and 14 inches of water
column for
NG, and between 11 and 14 inches of water column for LP.
GAS REQUIREMENTS
NATURAL GAS
WC
Manifold Pressure
5" (12.5 mb)
Min Line Pressure
6" (15 mb)
Max Line Pressure
14" (34.9 mb), .5 psi (3.5 kPa)
LP GAS
WC
Manifold Pressure
10” (25 mb)
Min Line Pressure
11” (27.4 mb)
Max Line Pressure
14” (34.9 mb), .5 psi (3.5 kPa)
5 - Gas Requirement
Содержание F6PGR304S2
Страница 2: ......
Страница 4: ......
Страница 28: ...EN 24 ...
Страница 52: ...FR 24 ...
Страница 76: ...ES 24 ...
Страница 77: ...23 Note Note Nota ...
Страница 78: ...24 Note Note Nota ...
Страница 79: ...25 Note Note Nota ...
Страница 80: ...26 Note Note Nota ...
Страница 81: ......
Страница 82: ...09FL8041 ed 02 2019 ...