102
SPARC Enterprise T5440 Server Service Manual • July 2009
2. Remove the air baffle.
Squeeze the air baffle latches toward each other and lift the air baffle straight up
and out of the chassis.
3. If you are installing the module into a previously empty slot, remove the plastic
connector cover on the motherboard.
4. Slide the module down into its slot.
FIGURE:
Installing a CMP Module
5. Rotate the ejector levers down to secure the module into place.
Next Steps
■
“Install the Top Cover” on page 150
■
“Slide the Server Into the Rack” on page 151
■
Содержание SPARC Enterprise T5440 Server
Страница 1: ......
Страница 2: ......
Страница 6: ......
Страница 14: ...xii SPARC Enterprise T5440 Server Service Manual July 2009 Field Replaceable Units 176 Index 179 ...
Страница 26: ...xxiv SPARC Enterprise T5440 Server Service Manual July 2009 ...
Страница 84: ...58 SPARC Enterprise T5440 Server Service Manual July 2009 ...
Страница 180: ...154 SPARC Enterprise T5440 Server Service Manual July 2009 ...
Страница 192: ...166 SPARC Enterprise T5440 Server Service Manual July 2009 ...
Страница 198: ...172 SPARC Enterprise T5440 Server Service Manual July 2009 ...
Страница 212: ...186 SPARC Enterprise T5440 Server Service Manual July 2009 ...
Страница 213: ......
Страница 214: ......