Figure 36: Locking the cable clamp of a PSU
▶
Pull the cable clamp up (1).
▶
Thread the power cord through the cable clamp (2).
▶
Press the cable clamp down until it engages to secure the cable (3).
It will take about 60 seconds until the server can be powered on.
4.7
Switching on the server
CAUTION
▶
Before switching on the server, make sure the top cover is closed.
In order to comply with applicable EMC regulations (regulations on
electromagnetic compatibility) and satisfy cooling requirements, the
server must not run while the top cover is removed.
▶
"Important information" on page 31
.
Basic hardware procedures
TX1330 M4
Upgrade and Maintenance Manual
81
Содержание PRIMERGY TX1330 M4
Страница 18: ...Content Upgrade and Maintenance Manual TX1330 M4 ...
Страница 276: ...Hard disk drive HDD solid state disk SSD 276 Upgrade and Maintenance Manual TX1330 M4 ...
Страница 286: ...Fans 286 Upgrade and Maintenance Manual TX1330 M4 ...
Страница 330: ...Expansion cards and backup units 330 Upgrade and Maintenance Manual TX1330 M4 ...
Страница 340: ...Main memory 340 Upgrade and Maintenance Manual TX1330 M4 ...
Страница 402: ...Accessible drives 402 Upgrade and Maintenance Manual TX1330 M4 ...
Страница 412: ... Resuming BitLocker functionality on page 121 Front panel 412 Upgrade and Maintenance Manual TX1330 M4 ...
Страница 474: ...Converting a floorstand model to a rack model 474 Upgrade and Maintenance Manual TX1330 M4 ...
Страница 478: ...Figure 315 Removing the intrusion switch holder A Cabling 478 Upgrade and Maintenance Manual TX1330 M4 ...
Страница 486: ...Cabling 486 Upgrade and Maintenance Manual TX1330 M4 ...
Страница 518: ...Appendix A 518 Upgrade and Maintenance Manual TX1330 M4 ...
Страница 520: ...FUJITSU Server PRIMERGY TX1330 M4 Reference Manual Reference Manual English Cable Plan for April 2022 ...
Страница 560: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...