
Concluding steps
▶
"Installing the top HDD cage" on page 52
▶
.
▶
"Connecting the power cord" on page 56
.
▶
"Switching on the server" on page 57
.
When the system is powered on after a CPU has been replaced or
upgraded, the Global Error indicator will start flashing with the message
CPU has been changed
.
This only indicates that the CPU configuration has been altered. There
is no technical problem.
Proceed as follows:
●
Restart your server.
●
As soon as the startup screen appears, press the [F2] function key to
enter the BIOS.
●
If a password is assigned, enter the password and press [Enter].
●
Select the
Save & Exit
menu.
●
Select
Save Changes and Exit
or
Save Changes and Reset
.
●
Verify that the Global Error indicator stops flashing.
▶
"Installing the bay cover" on page 58
▶
"Locking the server" on page 59
▶
If applicable,
"Updating or recovering the BIOS" on page 63
.
▶
Resume BitLocker, see
"Resuming BitLocker functionality" on page 68
.
11.4
Replacing the heat sink
Field Replaceable Unit
(FRU)
Hardware: 15 minutes
Processor (CPU)
148
Upgrade and Maintenance Manual
TX1310 M5
Содержание PRIMERGY TX1310 M5
Страница 14: ...Content Upgrade and Maintenance Manual TX1310 M5 ...
Страница 80: ...Power supply unit PSU 80 Upgrade and Maintenance Manual TX1310 M5 ...
Страница 124: ...Expansion cards 124 Upgrade and Maintenance Manual TX1310 M5 ...
Страница 156: ...Processor CPU 156 Upgrade and Maintenance Manual TX1310 M5 ...
Страница 174: ...Front panel and front USB 174 Upgrade and Maintenance Manual TX1310 M5 ...
Страница 216: ...System board and components 216 Upgrade and Maintenance Manual TX1310 M5 ...
Страница 238: ...Appendix A 238 Upgrade and Maintenance Manual TX1310 M5 ...
Страница 240: ...FUJITSU Server PRIMERGY TX1310 M5 Reference Manual Reference Manual English Cable plan for March 2022 ...
Страница 257: ...List of all used screws for PRIMERGY Servers Assembled in WCZ and FIT July 2021 ...