60
Operating Manual
RX2530 M4
Starting up and operation
2
[CSS]
CSS
indicator
off
No critical event detected (CSS
component).
orange
on
Prefailure event detected (CSS
component).
orange
flashing
CSS component failure detected.
3
Global
Error
indicator,
see also
"iRMC-
related
status
signals" on
page 61
off
No critical event detected (non
CSS component).
orange
on
Prefailure event detected (non
CSS component).
orange
flashing
Non CSS component failure
detected.
Possible causes:
– System is out of the specified
range
– Defective sensor
– CPU error
– Error detected by server
management software
4
HDD/SSD
activity
indicator
green
flashing
Data access in progress.
5
Power-on
indicator
off
– The server is switched off.
green on
– The server has been switched
on but Power Cycle Delay
settings delay it from turning
on for a specified time.
– The server is switched on and
operating normally.
green
flashing
slowly
iRMC S5 is not ready.
Pos.
Label
Indicator
Status
Description
!
Содержание PRIMERGY RX2540 M4
Страница 1: ...Operating Manual English FUJITSU Server PRIMERGY RX2530 M4 Operating Manual July 2017 ...
Страница 8: ...Operating Manual RX2530 M4 Contents ...
Страница 12: ...12 Operating Manual RX2530 M4 Introduction ...
Страница 30: ...30 Operating Manual RX2530 M4 Functional overview ...
Страница 78: ...78 Operating Manual RX2530 M4 Starting up and operation ...
Страница 80: ...80 Operating Manual RX2530 M4 Property and data protection ...