RX2530 M4
Operating Manual
71
Starting up and operation
Ê
Follow the on-screen instructions (see also section
server and installing the operating system with the ServerView
Installation Manager" on page 75
installing the operating system without the ServerView Installation
Manager" on page 76
).
–
System already installed
:
Ê
Press the On/Off button.
The server is switched on, performs a system test and boots the
operating system.
I
In the case of configurations with a large memory size, the boot
process may be prolonged and the screen may remain dark for
several minutes.
Switching the server off
The power-on indicator lights up green.
Ê
Shut down the operating system properly.
The server is switched off automatically and enters standby mode. The AC
connected indicator lights up green.
I
If the operating system does not switch off the server automatically, press
the On/Off button for at least four seconds and/or send a corresponding
control signal for power button override.
V
CAUTION!
There is a risk that data may be lost.
Other On/Off options
Besides the On/Off button, the server can be switched ON and OFF in the
following ways:
–
Timer-controlled switch-on/off
Using the ServerView Operations Manager or iRMC S5, you can configure
that the server is switched on/off controlled by an internal timer.
–
Ring indicator
The server is switched on by an internal or external modem.
–
Wake up On LAN (WOL)
The server is switched on by a command via the LAN (Magic Packet™).
Содержание PRIMERGY RX2540 M4
Страница 1: ...Operating Manual English FUJITSU Server PRIMERGY RX2530 M4 Operating Manual July 2017 ...
Страница 8: ...Operating Manual RX2530 M4 Contents ...
Страница 12: ...12 Operating Manual RX2530 M4 Introduction ...
Страница 30: ...30 Operating Manual RX2530 M4 Functional overview ...
Страница 78: ...78 Operating Manual RX2530 M4 Starting up and operation ...
Страница 80: ...80 Operating Manual RX2530 M4 Property and data protection ...