
26
Conversion procedure
3
Attach the rail assemblies (from step 1) and insert the rack nuts provided
into the rack holes.
This server requires 4U of cabinet space.
1
Attach the rails.
Fasten the front brackets to the rack with the flathead screws (M6) in the
rack’s 4th and 6th hole positions (counting up from the bracket base) as shown
in the diagram. Fasten the rear brackets in the same manner except using the
screws provided (M6) and washers instead of the flathead screws.
2
Attach the rack nuts provided.
Insert the rack nuts in the 2nd and 11th hole positions (counting from the bot-
tom) as shown in the diagram. When inserting the nuts, make sure to use the
ones provided with the kit (M5) as they have special catches to secure their
hole positions.
Installing to the rack
1
Pull the slide rails toward the front until they click into place.
Make sure to use the rack nuts (M5) provided with the rack con-
version kit and not the ones from the rack.
[Front]
[Rear]
Rack nut
Washers
To 2nd slot hole
To 11th slot hole
4th
6th
M6 flathead
screws
M6 screws
Server bottom
as reference point
1st
6th
Содержание PRIMERGY PG-R1CK6
Страница 7: ...vi ...
Страница 9: ...viii ...
Страница 11: ...x ...
Страница 13: ...2 本製品の梱包物 ブラケット C 1 2 M3 ネジ 6 M4 バインドネジ 4 M4 タップタイトネジ 4 M5 ネジ 1 8 M6 ネジ 1 4 部品 名称 数量 確認 ...
Страница 15: ...4 本製品の梱包物 ...
Страница 43: ...32 付録 ...
Страница 49: ...vi ...
Страница 51: ...viii ...
Страница 55: ...4 Ensuring the package ...
Страница 83: ...32 Conversion procedure ...
Страница 85: ...34 ...