
6
Conversion procedure
Workflow
Perform the work in the order listed below:
1
Pre-work preparations.
2
Remove the hard disk units.
3
Remove the left side cover.
4
Remove the drive cover.
5
Remove the front cover.
6
Remove the right side cover.
7
Reposition the devices.
8
Reattach the front cover.
9
Attach the rack front cover.
10
Reattach the left side cover.
11
Attach the rail brackets.
12
Convert to a rackmount model.
13
Reinstall the hard disk units.
14
Before turning on the server.
15
Update the Chassis ID.
Before moving the server, remove all hard disk units. Striking or
hitting a hard disk unit can corrupt its data.
Содержание PRIMERGY PG-R1CK6
Страница 7: ...vi ...
Страница 9: ...viii ...
Страница 11: ...x ...
Страница 13: ...2 本製品の梱包物 ブラケット C 1 2 M3 ネジ 6 M4 バインドネジ 4 M4 タップタイトネジ 4 M5 ネジ 1 8 M6 ネジ 1 4 部品 名称 数量 確認 ...
Страница 15: ...4 本製品の梱包物 ...
Страница 43: ...32 付録 ...
Страница 49: ...vi ...
Страница 51: ...viii ...
Страница 55: ...4 Ensuring the package ...
Страница 83: ...32 Conversion procedure ...
Страница 85: ...34 ...