
1 Pre-work preparations
7
E
1
Pre-work preparations
1
Complete the server information sheet in Appendix A.
2
Shutdown the server system if its running.
3
Turn off the server’s power (and any attached peripherals).
4
Disconnect all peripherals and unplug all device power cords.
2
Removing the hard disk units
After removing the front door, remove all the hard disk units from their 3.5-inch storage bays.
Note that these hard disks must be re-installed after the rack conversion is complete.
This section describes how to remove the hard disk units from their bays.
Notes:
Note that when converting the server from a deskside to a rackmount, the bay orientation is
different.
Make sure to write down the bay numbers and SCSI IDs for each hard disk so they can be
replaced to their proper locations.
Before moving the server, remove all hard disk units. Striking or
hitting a hard disk unit can corrupt its data.
Содержание PRIMERGY PG-R1CK6
Страница 7: ...vi ...
Страница 9: ...viii ...
Страница 11: ...x ...
Страница 13: ...2 本製品の梱包物 ブラケット C 1 2 M3 ネジ 6 M4 バインドネジ 4 M4 タップタイトネジ 4 M5 ネジ 1 8 M6 ネジ 1 4 部品 名称 数量 確認 ...
Страница 15: ...4 本製品の梱包物 ...
Страница 43: ...32 付録 ...
Страница 49: ...vi ...
Страница 51: ...viii ...
Страница 55: ...4 Ensuring the package ...
Страница 83: ...32 Conversion procedure ...
Страница 85: ...34 ...