
11 Before turning on the server
25
E
11
Before turning on the server
Be sure to confirm the following items before turning on the server:
Hard disk units
Cables
Expansion cards
Peripherals
Item
Check
Are all hard disks installed?
□
Are they properly installed?
□
Item
Check
Are all cable connections correct?
□
Is each cable properly seated?
□
Are all cables connected?
□
Did you disconnect the cables as instructed?
□
Did you reconnect the server’s power cable from "1 Pre-work
preparations"?
□
Item
Check
Are all expansion cards properly seated in their PCI slots? (Some
expansion cards may have become loose while performing the
conversion.)
□
Item
Check
Did you reconnect the peripherals disconnected from "1 Pre-work
preparations"?
□
Содержание PRIMERGY PG-R1CK1
Страница 3: ...ii 会社名および製品名は 各社の商標または登録商標です All Rights Reserved Copyright 富士通株式会社 2002 ...
Страница 7: ...vi ...
Страница 9: ...viii ...
Страница 11: ...x ...
Страница 13: ...2 本製品の梱包物 ブラケット B 1 2 ブラケット C 1 2 ストッパー 1 M3 ネジ 1 M4 ヘックスローブネジ 3 4 M5 ネジ 8 部品 名称 数量 確認 ...
Страница 14: ...3 J M6 ネジ 4 4 M6 サラネジ 1 4 スクリューホルダー 1 4 M5 ラックナット 4 部品 名称 数量 確認 ...
Страница 25: ...14 操作方法 6 イントリュージョンケーブルの取り外し 1 サーバ本体を図のようにして横にして置きます 2 イントリュージョンケーブルをコネクタから取り外します イントリュージョン ケーブル ...
Страница 27: ...16 操作方法 2 サーバ本体をラックボトムパネルの上に置きます 3 サーバ本体を ラックフロントパネルの方向に止まるまで押します ...
Страница 39: ...28 付録 ...
Страница 45: ...vi ...
Страница 47: ...viii ...
Страница 50: ...3 E M6 screw 4 4 M6 flathead screw 1 4 Washer 1 4 M5 rack nut 4 Item Name Qty Check ...
Страница 75: ...28 Conversion procedure ...
Страница 77: ...30 ...