
9 Installing the server in the rack cabinet
19
E
2
Attach the rail assemblies and insert the rack nuts.
This server requires 5U of cabinet space.
1
Attach the rails.
Align the brackets and spring-nuts to the desired height in the cabinet and
fasten both the front and rear brackets with the 4 screws (M5) provided.
2
Insert the rack nuts.
Insert the rack nuts in the rack’s 3rd and 13th hole positions (counting from
the bracket’s base) as shown in the diagram. Make sure to use the rack nuts
provided with the kit (M5) as they have special catches to secure their hole
positions.
Make sure to use the rack nuts (M5) provided with the rack con-
version kit and not the ones used on the rack cabinet.
[Front]
[Rear]
M5 rack nuts
3rd
13th
M5 screws
M5 screws
Server bottom
as reference point
Содержание PRIMERGY PG-R1CK1
Страница 3: ...ii 会社名および製品名は 各社の商標または登録商標です All Rights Reserved Copyright 富士通株式会社 2002 ...
Страница 7: ...vi ...
Страница 9: ...viii ...
Страница 11: ...x ...
Страница 13: ...2 本製品の梱包物 ブラケット B 1 2 ブラケット C 1 2 ストッパー 1 M3 ネジ 1 M4 ヘックスローブネジ 3 4 M5 ネジ 8 部品 名称 数量 確認 ...
Страница 14: ...3 J M6 ネジ 4 4 M6 サラネジ 1 4 スクリューホルダー 1 4 M5 ラックナット 4 部品 名称 数量 確認 ...
Страница 25: ...14 操作方法 6 イントリュージョンケーブルの取り外し 1 サーバ本体を図のようにして横にして置きます 2 イントリュージョンケーブルをコネクタから取り外します イントリュージョン ケーブル ...
Страница 27: ...16 操作方法 2 サーバ本体をラックボトムパネルの上に置きます 3 サーバ本体を ラックフロントパネルの方向に止まるまで押します ...
Страница 39: ...28 付録 ...
Страница 45: ...vi ...
Страница 47: ...viii ...
Страница 50: ...3 E M6 screw 4 4 M6 flathead screw 1 4 Washer 1 4 M5 rack nut 4 Item Name Qty Check ...
Страница 75: ...28 Conversion procedure ...
Страница 77: ...30 ...