
96
Upgrade and Maintenance Manual
CX270
S2
Expansion cards, interposer boards and battery backup units
Figure 42: Latching the locking bail
Ê
Carefully fold up and latch the locking bail.
Figure 43: Attaching the protective optical port plug
Ê
If the SFP+ transceiver module is not immediately connected to an LC
connector, attach the protective optical port plug to the transceiver optical
bores.
Содержание Primergy CX270 S2
Страница 6: ...Upgrade and Maintenance Manual CX270 S2 ...
Страница 18: ...18 Upgrade and Maintenance Manual CX270 S2 ...
Страница 246: ...246 Upgrade and Maintenance Manual CX270 S2 Processors Figure 163 Opening the load plate B Ê Fully open the load plate ...
Страница 302: ...302 Upgrade and Maintenance Manual CX270 S2 System board and components ...