CX270 S2
Upgrade and Maintenance Manual
135
Expansion cards, interposer boards and battery backup units
6.5.1.5
Installing a TESLA GPGPU card
I
If an expansion card is planned to be installed in slot 2, install it first. See
section
"SAS RAID controller on PCI slot 2" on page 113
.
Figure 70: Installing the TESLA GPGPU card (A)
Ê
Place the TESLA GPGPU card into the server node.
I
Make sure that the mounting brackets engage onto the centering
bolts (see circles).
Содержание Primergy CX270 S2
Страница 6: ...Upgrade and Maintenance Manual CX270 S2 ...
Страница 18: ...18 Upgrade and Maintenance Manual CX270 S2 ...
Страница 246: ...246 Upgrade and Maintenance Manual CX270 S2 Processors Figure 163 Opening the load plate B Ê Fully open the load plate ...
Страница 302: ...302 Upgrade and Maintenance Manual CX270 S2 System board and components ...