44
Operating Manual
CX2550 M1
Starting up and operation
Switching the server node on
Ê
Connect a USB storage medium (hard disk drive, optical drive or flash
media) containing a bootable image to your server.
Ê
Press the On/Off button.
The power-on indicator lights up green when the server node is connected to
the mains.
I
Alternatively, the power can be switched on/off on the chassis front panel
of the PRIMERGY CX400 M1 server enclosure.
Further information you can find in the "FUJITSU Server PRIMERGY
CX400 M1 Server Enclosure Operating Manual" and in the "FUJITSU
Server PRIMERGY CX400 M1 Server Enclosure Upgrade and
Maintenance Manual".
–
Starting up for the first time:
For the Japanese market, please refer to "
はじめにお読みください
".
Ê
Insert ServerView Suite DVD in the DVD drive.
Ê
Follow the on-screen instructions (see also section
"Configuring the
server node" on page 46
).
–
System already installed
:
The server node is switched on, performs a system test and boots the
operating system.
I
In the case of configurations with a large memory size, the boot
process may be prolonged and the screen may remain dark for about
20 seconds.
Switching the server node off
Ê
Shut down the operating system properly.
I
The server nodes are controlled via related operating panel areas on the
front side of the CX400 M1 server enclosure. See "FUJITSU Server
PRIMERGY CX400 M1 Server Enclosure Operating Manual".
I
If the operating system does not switch the server node off automatically,
press the On/Off button for at least four seconds and/or send a
corresponding control signal for power button override.