BX2560 M1
Operating Manual
51
Starting up and operation
Indicators on the control panel
Power-on indicator (three colors)
–
Lights up green
when the server is switched ON.
–
Lights up orange
when the server is switched OFF, but mains
voltage is present (standby mode).
I
After connecting the server to the mains, it will take about
60 seconds until the server will switch into standby mode.
–
Flashes light-green / orange:
iRMC booting
I
After linking the server to the mains voltage (system unit
is switched on / after mains failure) the iRMC will boot.
The system cannot be switched on, until the iRMC boot
sequence is complete. During this time, the power-on
indicator will flash light-green / orange.
–
Lights up light-green:
power-on delay
I
After shutting down, the server cannot be switched on
again right away. If the On/Off button is pressed right
after shutting down the server, the power-on indicator will
light up light-green until the delay period ends and the
server will boot.
If line voltage is insufficient, the server cannot be
switched on. If the On/Off button is pressed in this state,
the power-on indicator will light up light-green.
Содержание Primergy BX2560 M1
Страница 6: ...Operating Manual BX2560 M1 ...
Страница 12: ...12 Operating Manual BX2560 M1 Introduction ...
Страница 26: ...26 Operating Manual BX2560 M1 Functional overview ...
Страница 64: ...64 Operating Manual BX2560 M1 Property and data protection ...