
27
Contents
1.2 Devices that can be mounted on this rack ............................................... 28
2 Precautions on Rack Installation and Operation ................................................29
2.1 Precautions on Installation and Operation .............................................. 29
(250 gal) ........................................................33
(1000 gal) .......................................................34
4.1 Changing the Position of the Door Rotation Axis ........................................ 38
4.1.1 Changing the position of the rotation axis of the front door ...................38
4.4 Attaching the Quake Proof Stabilizer Kit .................................................... 45
4.5 Cable duct bracket for 19-inch Rack ......................................................... 46
4.5.1 Inserting cage nuts ..............................................................................46
4.5.2 Fixation of cable duct mounting bracket ...............................................47
4.5.3 Temporarily securing the rear bracket ..................................................47