Power
on
the
equipment
within
the
temperature
range
in
the
prescribed
temperature
conditions.
For
details
on
the
operating
environment,
see
Failure
to
operate
the
equipment
within
the
prescribed
temperature
range
may
lead
to
malfunctions
or
loss
of
data.
Fujitsu
is
not
responsible
for
any
damage
or
failure
caused
by
use
of
the
equipment
outside
the
temperature
range
for
guaranteed
operation.
Data
Loss
If
the
node
is
not
automatically
powered
off,
you
can
shut
it
down
by
pressing
the
power
button
for
at
least
4
seconds.
However,
data
loss
may
occur
when
the
node
is
not
properly
shut
down
according
to
Chapter
4
Operation
This
chapter
describes
operation
of
the
FX700
main
unit.
Keep
the
contents
of
in
mind
when
using
the
equipment.
4.1
Power
On/Off
This
section
describes
how
to
power
on/off
the
system.
-
Press
the
button
to
power
on
or
off
the
system.
-
Short
press
the
button
to
power
on
all
nodes
(only
if
all
the
nodes
in
the
device
are
off).
-
Long
press
the
button
(4
seconds
or
longer)
to
start
shutdown
of
the
operating
systems
on
all
nodes.
4.1.1
Turning
On/Off
AC
Power
to
the
FX700
Main
Unit
Turning
On
AC
Power
to
the
FX700
Main
Unit
The
green
PSU
status
LED
blinks
when
the
equipment
is
connected
to
the
main
power
supply.
Approximately
4
minutes
are
required
until
the
node
can
be
powered
on.
The
BMC
ready
LED
blinks
during
this
period.
The
BMC
ready
LED
stays
on
and
does
not
blink
when
the
node
can
be
powered
on.
Turning
Off
AC
Power
to
the
FX700
Main
Unit
Confirm
that
the
green
PSU
status
LED
is
blinking,
and
then
remove
the
power
cord.
4.1.2
Changing
the
Power
Supply
Status
of
Nodes
When
using
operations
management
software,
follow
the
manual
for
your
operations
management
software.
For
the
procedure
to
power
on/off
a
node
without
using
operations
management
software,
see
"3.3
Power
Control"
in
the
FUJITSU
Supercomputer
PRIMEHPC
FX700
BMC
User's
Guide
(C120-0091EN).
Chapter
4
Operation
C120-0089-03EN
4.1
Power
On/Off
56
Содержание PRIMEHPC FX1000
Страница 97: ......