3.2 Mounting Requirements
C156-E224-01EN
3-9
3.2.4 Notes on mounting
(1) Mounting frame structure and clearance
a)
For vibration resistance and heat dissipation, this optical disk drive uses an
embossed structure as shown in Figure 3.6, as well as a frame which has a
construction similar to other frames which perform the same function.
b)
As shown in Figure 3.6, the inward projection of the mounting screw from the
outer surface of the drive frame must not exceed 3 mm.
c)
The clearance between the external surface of the drive frame and the user's
frame structure must be at least 1.5 mm.
d)
The clearance between the top and bottom surfaces and the user's frame
structure must be at least 1.5 mm.
e)
When mounting the optical disk drive, the screw tightening torque should be
0.4 to 0.45Nm (4 to 4.6kgcm).
f)
When the optical disk drive (with panel) is mounted in a locker, there should
be no deformation of the mounting fittings provided and the optical disk
drive's panel should not be deformed. If the drive is used with the panel
deformed, ejection of the cartridge will be faulty. Check if the door will close
from any position whatever when the optical disk drive is installed.
φ
15
or less
φ
15
or less
If a bottom surface mounted.
Figure 3.6 Mounting frame structure
Содержание MCJ3230SS
Страница 1: ...C156 E224 01EN MCJ3230SS OPTICAL DISK DRIVE PRODUCT MANUAL ...
Страница 4: ...This page is intentionally left blank ...
Страница 19: ...C156 E224 01EN xv Figure 6 1 Revision label 6 4 Figure 6 2 Revision number indication 6 4 ...
Страница 22: ...This page is intentionally left blank ...
Страница 34: ...This page is intentionally left blank ...
Страница 46: ...Specifications 2 12 C156 E224 01EN Figure 2 3 Example of alternate processing ...
Страница 52: ...Installation Requirements 3 6 C156 E224 01EN Unit mm Figure 3 3 Dimensions without panel ...
Страница 59: ...3 4 Cable Connections C156 E224 01EN 3 13 PC board Figure 3 11 Shape of setting terminal ...
Страница 74: ...This page is intentionally left blank ...
Страница 124: ...Host Interface 4 50 C156 E224 01EN Figure 4 5 ARBITRATION phase ...
Страница 125: ...4 5 Timing Rule C156 E224 01EN 4 51 µ Figure 4 6 SELECTION phase Figure 4 7 RESELECTION phase ...
Страница 126: ...Host Interface 4 52 C156 E224 01EN Figure 4 8 Transfer in asynchronous mode ...
Страница 127: ...4 5 Timing Rule C156 E224 01EN 4 53 Figure 4 9 Transfer in FAST SCSI mode ...
Страница 128: ...Host Interface 4 54 C156 E224 01EN Figure 4 10 ATTENTION condition ...
Страница 150: ...This page is intentionally left blank ...
Страница 158: ...This page is intentionally left blank ...
Страница 160: ......
Страница 161: ......