1-11
C141-C007
If received pCRC and computed pCRC do not match (i.e., a pCRC error is detected), or if an
improperly formatted data group is transferred, then the INIT creates an attention
condition or before the last transfer of the pCRC field. When the TARG switches to a
MESSAGE OUT phase the INIT sends an INITIATOR DETECTED ERROR message to
the TARG. This message notifies the TARG that data contained within the data group
was invalid.
If the TARG does not retry transferring the information transfer or it exhausts its retry limit
the TARG goes into a STATUS phase and send a CHECK CONDITION status with a
sense key set to ABORTED COMMAND and an additional sense code set to
INITIATOR DETECTED ERROR MESSAGE RECEIVED for the task associated with
the received INITIATOR DETECTED ERROR message.
(d) Data Group Pad field and pCRC field transfer from INIT to TARG
If the I/O signal is false (transfer to the target), the INIT determines the data field transfer is
complete by detecting an assertion of the P_CRCA signal. If the REQ signal is asserted (i.e., pad
field required) the INIT shall first transfer the two pad bytes, then the four pCRC bytes. If the
REQ signal is negated (i.e., no pad field required) the INIT shall transfer the four pCRC bytes.
Pad field data and pCRC field data are transferred using the same negotiated values as the data
field data.
The TARG may continue to send REQs, up to the negotiated offset, for the next data group. The
TARG shall not transition REQ with P_CRCA asserted until the initiator has responded with all
ACK transitions for the previous data group.
When the INIT detects an assertion of the P_CRCA signal and the REQ signal is asserted (i.e.,
pad field required), the transmission sequence is the following way.
1)
Transfer data bytes for all outstanding REQs received prior to the REQ that had the
P_CRCA signal asserted. INIT drives the DB(15-0) signals to their desired pad values.
2)
INIT delays at least one transmit setup time, negates the ACK signal and holds the
DB(15-0) signals valid for a minimum of one transmit hold time and the ACK signal
negated for a minimum of a transmit assertion period.
3)
INIT drives the DB(15-0) signals to their desired pCRC values, delays at least one
transmit setup time, asserts the ACK signal and holds the DB(15-0) signals valid for a
minimum of one transmit hold time and the ACK signal asserted for a minimum of a
transmit assertion period.
4)
INIT drives the DB(15-0) signals to their desired pCRC values and delays at least one
transmit setup time.
5)
INIT negates the ACK signal and holds the DB(15-0) signals valid for a minimum of one
transmit hold time and the ACK signal negated for a minimum of a transmit assertion
period.
Содержание MBA3300 NP SERIES
Страница 6: ...This page is intentionally left blank ...
Страница 18: ...This page is intentionally left blank ...
Страница 27: ...C141 C015 21 M M 0 61 5 16 0 001 0 396 Figure 1 5 SCSI interface connector cable side 16 bit SCSI ...
Страница 61: ...C141 C015 55 2 SE Fast 20 Figure 1 21 is the Fast 20 measurement point Figure 1 21 Fast 20 Measurement Point ...
Страница 69: ...C141 C015 63 Figure 1 26 ARBITRATION phase ...
Страница 81: ......
Страница 117: ...1 37 C141 C007 Figure 1 43 Bus phase sequence 1 of 2 ...
Страница 118: ...38 C141 C015 Figure 1 43 Bus phase sequence 2 of 2 ...
Страница 119: ...1 39 C141 C007 Figure 1 44 Example of bus phase transition at execution of a single command 1 of 5 ...
Страница 120: ...40 C141 C015 Figure 1 44 Example of bus phase transition at execution of a single command 2 of 5 ...
Страница 121: ...1 41 C141 C007 RESELECTION Figure 1 44 Example of bus phase transition at execution of a single command 3 of 5 ...
Страница 122: ...42 C141 C015 Figure 1 44 Example of bus phase transition at execution of a single command 4 of 5 ...
Страница 123: ...1 43 C141 C007 Figure 1 44 Example of bus phase transition at execution of a single command 5 of 5 TASK COMPLETE ...
Страница 128: ...48 C141 C015 Figure 1 47 SPI information unit sequence during initial connection ...
Страница 129: ...1 49 C141 C007 Figure 1 48 SPI information unit sequence during data type transfers ...
Страница 130: ...50 C141 C015 Figure 1 49 SPI information unit sequence during data stream type transfers ...
Страница 131: ...1 51 C141 C007 Figure 1 50 SPI information unit sequence during status transfers ...
Страница 155: ...1 75 C141 C007 Figure 1 56 Connection to the LVD receivers ...
Страница 161: ...Figure 2 1 Message format 154 C141 C015 ...
Страница 166: ...Figure 2 2 SCSI pointer configuration C141 C015 159 ...
Страница 201: ...This page is intentionally left blank ...
Страница 205: ...This page is intentionally left blank ...
Страница 207: ...This page is intentionally left blank ...
Страница 208: ......
Страница 209: ......