![Fujitsu MBA3300 NP SERIES Скачать руководство пользователя страница 157](http://html.mh-extra.com/html/fujitsu/mba3300-np-series/mba3300-np-series_technical-manual_118322157.webp)
1-77
C141-C007
Table 1.33
Maximum capacitance
Capacitance measurement
Max.
Notes
C1(pF) 15
@V=0.7 to 1.8 VDC -Signal/GND
REQ, ACK and DB(15-0,P_CRCA,P1)
C2(pF) 15
@V=0.7 to 1.8 VDC -Signal/GND
REQ, ACK and DB(15-0,P_CRCA,P1)
C3(pF) 8
@V=0.7 to 1.8 VDC -Signal/GND
REQ, ACK and DB(15-0,P_CRCA,P1)
C1(pF) 25
@V=0.7 to 1.8 VDC -Signal/GND
all other signals
C2(pF) 25
@V=0.7 to 1.8 VDC -Signal/GND
all other signals
C3(pF) 13
@V=0.7 to 1.8 VDC -Signal/GND
V is the same for both s/- 100 mV
all other siganls
|C1-C2| (pF)
1.5
REQ, ACK and DB(15-0, P_CRCA, P1)
|C1-C2| (pF)
3
All other signal
|C1 – C1(REQ)|(pF)
2
For C1is any capacitance of DB(15-
0,P_CRCA,P1)
|C2 – C2(REQ)|(pF)
2
For C2is any capacitance of DB(15-
0,P_CRCA,P1)
|C1 – C1(ACK)|(pF)
2
For C1is any capacitance of DB(15-
0,P_CRCA,P1)
|C2 – C2(ACK)|(pF)
2
For C2is any capacitance of DB(15-
0,P_CRCA,P1)
1.12.7 System level requirements for LVD SCSI drivers and receivers
The requirements for LVD SCSI drivers and receivers are based on the system level requirements
stated in Table 1.34. Some of these requirements are specifically called out in other subclauses
while others are derived from bus loading conditions and trade-offs between competing
parameters.
Содержание MBA3300 NP SERIES
Страница 6: ...This page is intentionally left blank ...
Страница 18: ...This page is intentionally left blank ...
Страница 27: ...C141 C015 21 M M 0 61 5 16 0 001 0 396 Figure 1 5 SCSI interface connector cable side 16 bit SCSI ...
Страница 61: ...C141 C015 55 2 SE Fast 20 Figure 1 21 is the Fast 20 measurement point Figure 1 21 Fast 20 Measurement Point ...
Страница 69: ...C141 C015 63 Figure 1 26 ARBITRATION phase ...
Страница 81: ......
Страница 117: ...1 37 C141 C007 Figure 1 43 Bus phase sequence 1 of 2 ...
Страница 118: ...38 C141 C015 Figure 1 43 Bus phase sequence 2 of 2 ...
Страница 119: ...1 39 C141 C007 Figure 1 44 Example of bus phase transition at execution of a single command 1 of 5 ...
Страница 120: ...40 C141 C015 Figure 1 44 Example of bus phase transition at execution of a single command 2 of 5 ...
Страница 121: ...1 41 C141 C007 RESELECTION Figure 1 44 Example of bus phase transition at execution of a single command 3 of 5 ...
Страница 122: ...42 C141 C015 Figure 1 44 Example of bus phase transition at execution of a single command 4 of 5 ...
Страница 123: ...1 43 C141 C007 Figure 1 44 Example of bus phase transition at execution of a single command 5 of 5 TASK COMPLETE ...
Страница 128: ...48 C141 C015 Figure 1 47 SPI information unit sequence during initial connection ...
Страница 129: ...1 49 C141 C007 Figure 1 48 SPI information unit sequence during data type transfers ...
Страница 130: ...50 C141 C015 Figure 1 49 SPI information unit sequence during data stream type transfers ...
Страница 131: ...1 51 C141 C007 Figure 1 50 SPI information unit sequence during status transfers ...
Страница 155: ...1 75 C141 C007 Figure 1 56 Connection to the LVD receivers ...
Страница 161: ...Figure 2 1 Message format 154 C141 C015 ...
Страница 166: ...Figure 2 2 SCSI pointer configuration C141 C015 159 ...
Страница 201: ...This page is intentionally left blank ...
Страница 205: ...This page is intentionally left blank ...
Страница 207: ...This page is intentionally left blank ...
Страница 208: ......
Страница 209: ......