![Fujitsu MBA3300 NP SERIES Скачать руководство пользователя страница 184](http://html.mh-extra.com/html/fujitsu/mba3300-np-series/mba3300-np-series_technical-manual_118322184.webp)
Table 2.7
Data bus width defined by message exchange
Response message
Data bus width
WIDE DATA TRANSFER REQUEST
Transfer Width Exponent > 1
Data is transferred using the responded data bus width.
WIDE DATA TRANSFER REQUEST
Transfer Width Exponent = 0
8-bit data transfer
MESSAGE REJECT message
8-bit data transfer
(2)
Message exchange started by the INIT
If the INIT needs to select the wide data transfer mode, it asserts the ATN signal to start message
exchange. Then, the INIT requests the TARG to receive the WIDE DATA TRANSFER
REQUEST message. When the MESSAGE OUT phase has terminated normally, the TARG shall
return an appropriate WIDE DATA TRANSFER REQUEST message to the INIT. If the TARG
cannot return the message normally, these two SCSI devices shall set the 8-bit data bus width
between them.
If the INIT asserts the ATN signal in the MESSAGE IN phase and sends the MESSAGE REJECT
message even if the TARG returns a WIDE DATA TRANSFER REQUEST message which
indicates a non-zero value in its Transfer Width Exponent field, the two SCSI devices shall set the
8-bit data bus width between them.
If the INIT sends the MESSAGE PARITY ERROR message or the INITIATOR DETECTED
ERROR message against the TARG'S WIDE DATA TRANSFER REQUEST message, the HDD
recognizes that there was a parity error in the previous MESSAGE IN phase. Then the HDD
performs the error recovery procedure based on the SCSI Bus protocol for the erroneous phase up
to 3 times. If the retry fails, this negotiation is regarded as a failure. The mode setting for wide
transfer between the INIT and the TARG must be set to the 8-bit data bus width.
(3)
Message exchange started by the TARG
If the TARG recognizes the need of message exchange and if the wide data mode transfer request
is enabled by the CHANGE DEFINITION command, the TARG sends the WIDE DATA
TRANSFER REQUEST message to the INIT. The INIT shall assert the ATN signal and return
the WIDE DATA TRANSFER REQUEST message or the MESSAGE REJECT message before
negating the ACK signal of the last byte of WIDE DATA TRANSFER REQUEST message which
has been sent from the TARG. If the INIT cannot respond to this message, the two SCSI devices
shall set the 8-bit data bus width between them.
Both the INIT and the TARG shall not consider the completion of WIDE DATA TRANSFER
REQUEST message exchange until the TARG terminates the MESSAGE OUT phase by entering
another INFORMATION TRANSFER phase (which indicates that no parity error has been
detected) even if the INIT responds with the WIDE DATA TRANSFER REQUEST message. If
the TARG cannot normally receive a response message by the INIT after the specified number of
retries, the TARG shall immediately negate the BSY signal and enter the BUS FREE phase
without starting another INFORMATION TRANSFER phase.
The INIT shall consider it as the unsuccessful message exchange, and the two SCSI devices shall
set the 8-bit data bus width between them.
C141-C015
177
Содержание MBA3300 NP SERIES
Страница 6: ...This page is intentionally left blank ...
Страница 18: ...This page is intentionally left blank ...
Страница 27: ...C141 C015 21 M M 0 61 5 16 0 001 0 396 Figure 1 5 SCSI interface connector cable side 16 bit SCSI ...
Страница 61: ...C141 C015 55 2 SE Fast 20 Figure 1 21 is the Fast 20 measurement point Figure 1 21 Fast 20 Measurement Point ...
Страница 69: ...C141 C015 63 Figure 1 26 ARBITRATION phase ...
Страница 81: ......
Страница 117: ...1 37 C141 C007 Figure 1 43 Bus phase sequence 1 of 2 ...
Страница 118: ...38 C141 C015 Figure 1 43 Bus phase sequence 2 of 2 ...
Страница 119: ...1 39 C141 C007 Figure 1 44 Example of bus phase transition at execution of a single command 1 of 5 ...
Страница 120: ...40 C141 C015 Figure 1 44 Example of bus phase transition at execution of a single command 2 of 5 ...
Страница 121: ...1 41 C141 C007 RESELECTION Figure 1 44 Example of bus phase transition at execution of a single command 3 of 5 ...
Страница 122: ...42 C141 C015 Figure 1 44 Example of bus phase transition at execution of a single command 4 of 5 ...
Страница 123: ...1 43 C141 C007 Figure 1 44 Example of bus phase transition at execution of a single command 5 of 5 TASK COMPLETE ...
Страница 128: ...48 C141 C015 Figure 1 47 SPI information unit sequence during initial connection ...
Страница 129: ...1 49 C141 C007 Figure 1 48 SPI information unit sequence during data type transfers ...
Страница 130: ...50 C141 C015 Figure 1 49 SPI information unit sequence during data stream type transfers ...
Страница 131: ...1 51 C141 C007 Figure 1 50 SPI information unit sequence during status transfers ...
Страница 155: ...1 75 C141 C007 Figure 1 56 Connection to the LVD receivers ...
Страница 161: ...Figure 2 1 Message format 154 C141 C015 ...
Страница 166: ...Figure 2 2 SCSI pointer configuration C141 C015 159 ...
Страница 201: ...This page is intentionally left blank ...
Страница 205: ...This page is intentionally left blank ...
Страница 207: ...This page is intentionally left blank ...
Страница 208: ......
Страница 209: ......