C141-E103-01EN
5 - 12
5.6
Confirming Operations after Installation and Preparation for use
5.6.1
Confirming initial operations
This section describes the operation check procedures after power is turned on. Since the initial
operation of the IDD depends on the setting of the motor start mode, check the initial operation by
either of the following procedures.
(1)
Initial operation in the case of setting so that motor starts at powering-on
a) When power is turned on, the LED blinks an instant and the IDD executes initial self-
diagnosis.
b) If an error is detected in the initial self-diagnosis, the LED blinks periodically.
Remark:
The spindle motor may or may not start rotating in this stage.
c) When the IDD status is idle, the LED remains off (when the initiator accesses the IDD via the
SCSI bus, the LED lights).
(2)
Initial operation in the case of setting so that motor starts with START/STOP command
a) When power is turned on, the LED blinks an instant and the IDD executes initial self-
diagnosis.
b) If an error is detected in the initial self-diagnosis, the LED blinks.
c) The spindle motor does not start rotating until the START/STOP UNIT command for the start
is issued. The INIT needs to issue the START/STOP UNIT command to start the spindle
motor by the procedure in Subsection 5.6.2.
d) The disk drive enters the READY status in 60 seconds after the START/STOP UNIT
command is issued. At this time, the IDD reads "system information" from the system space
on the disk.
e) The LED blinks during command execution.
(3)
Check items at illegal operation
a) Check that cables are mounted correctly.
b) Check that power and voltages are supplied correctly (measure them with the IDD power
connection position).
c) Check the setting of each setting terminal. Note that the initial operation depends on the
setting of the motor start mode and LED display requirements.
Содержание MAH3091MC - Enterprise 9.1 GB Hard Drive
Страница 3: ...This page is intentionally left blank ...
Страница 19: ...This page is intentionally left blank ...
Страница 37: ...This page is intentionally left blank ...
Страница 55: ...C141 E103 01EN 4 2 3 175 0 25 Figure 4 1 External dimensions MAH series MC model ...
Страница 56: ... 1 LJXUH WHUQDO GLPHQVLRQV 0 VHULHV 03 PRGHO ...
Страница 57: ...C141 E103 01EN 4 4 3 175 0 25 Figure 4 3 External dimensions MAJ series MC model ...
Страница 58: ... 1 LJXUH WHUQDO GLPHQVLRQV 0 VHULHV 03 PRGHO ...
Страница 63: ...C141 E103 01EN 4 10 MAJ series Figure 4 10 Air pressure adjustment hole Air pressure adjustment hole ...
Страница 70: ...C141 E103 01EN 4 17 Figure 4 20 External operator panel connector CN2 ...
Страница 81: ...This page is intentionally left blank ...
Страница 85: ...C141 E103 01EN 5 4 3 Connecting more than one IDD multi host Figure 5 1 SCSI bus connections 2 of 2 ...
Страница 95: ...C141 E103 01EN 5 14 Motor starts when power is turned on Figure 5 4 Checking the SCSI connection A 60 ...
Страница 127: ...8 4 C141 E103 01EN Servo Demodulator Buffer DRAM 1 Mbit 32 4 MByte Read Channel Figure 8 1 Circuit configuration ...
Страница 138: ...C141 E103 01EN 8 15 This page is intentionally left blank ...
Страница 144: ...This page is intentionally left blank ...
Страница 145: ...C141 E103 01EN B 1 APPENDIX B SETTING TERMINALS B 1 Setting Terminals This appendix describes setting terminals ...
Страница 148: ...This page is intentionally left blank ...
Страница 152: ...This page is intentionally left blank ...
Страница 157: ......