
Chapter 5 Troubleshooting
IP-920E/DC
68
5.3.2
Change equipment (Only for CE)
When the failure situation is not recovered even if you check and follow the instructions by
referring to Section 5.1, “Help Information”, the hardware might be failure. Change hardware as
below.
The equipment itself is regarded as repair unit. When you regarded it as failure, please change the
equipment.
In case that the optional CF card is installed in the main unit, please do not forget to remove it and
re-install in the replaced unit.
Please refer to Section 2.6, “CF card insertion and removal,” for the respective maintenance.
CF CARD
/ACT
RDY
PWR ALM
IN
DWN
OPT
100M
LINK
E
Содержание IP-920 E/DC
Страница 1: ...IP 920E DC Hardware User s Guide ...
Страница 2: ... This page is intentionally left blank ...
Страница 16: ... This page is intentionally left blank ...
Страница 22: ... This page is intentionally left blank ...
Страница 35: ...Chapter 2 Installation and Connection IP 920E DC 21 6 Install IP 920 on 19 rack using two pan head screws M5 ...
Страница 54: ......
Страница 56: ... This page is intentionally left blank ...
Страница 62: ... This page is intentionally left blank ...
Страница 66: ...Chapter 4 Cable specifications IP 920E DC 52 4 AUDIO Adapter cable 1 3 ...
Страница 72: ... This page is intentionally left blank ...
Страница 74: ... This page is intentionally left blank ...
Страница 84: ... This page is intentionally left blank ...
Страница 85: ...Appendix IP 920E DC 71 A 1 Appearance The appearance of IP 920E DC is shown below A 1 ...
Страница 97: ...Glossary and Index Glossary 85 Index 88 CE Conformity Information 90 Glossary and Index ...
Страница 98: ... This page is intentionally left blank ...
Страница 106: ......