21
Tubing
4.5.3 Tubing Connections
Indoor coils have only a holding charge of
GU\QLWURJHQ.HHSDOOWXEHHQGVVHDOHGXQWLO
connections are to be made.
• Use type “L” copper refrigeration tubing. Braze
WKHFRQQHFWLRQVZLWKWKHIROORZLQJDOOR\V
– copper to copper, 5% silver minimum
– copper to steel or brass, 15% silver minimum
• Be certain both refrigerant shutoff valves at the
outdoor unit are closed.
• Remove the caps and Schrader cores from the
pressure ports to protect seals from heat damage.
Both the Schrader valves and the service valves
have seals that may be damaged by excessive heat.
• Clean the inside of the fittings and outside of the
WXELQJZLWKDFOHDQGU\FORWKEHIRUHVROGHULQJ&OHDQ
out debris, chips, dirt, etc., that enters tubing or
service valve connections.
•
:UDSYDOYHVZLWKDZHWUDJRUWKHUPDOEDUULHU
compound before applying heat.
•
%UD]HWKHWXELQJEHWZHHQWKHRXWGRRUXQLWDQG
LQGRRUFRLO)ORZGU\QLWURJHQLQWRDSUHVVXUHSRUW
DQGWKURXJKWKHWXELQJZKLOHEUD]LQJEXWGRQRW
DOORZSUHVVXUHLQVLGHWXELQJZKLFKFDQUHVXOWLQ
OHDNV2QFHWKHV\VWHPLVIXOORIQLWURJHQWKH
nitrogen regulator should be turned off to avoid
pressuring the system.
• A
IWHUEUD]LQJXVHDQDSSURSULDWHKHDWVLQNPDWHULDO
to cool the joint.
• Reinstall the Schrader cores into both pressure
ports.
'RQRWDOORZWKHEDUHYDSRUOLQHDQGOLTXLGOLQH
WREHLQFRQWDFWZLWKHDFKRWKHU7KLVFDXVHVDQ
undesirable heat transfer resulting in capacity
ORVVDQGLQFUHDVHGSRZHUFRQVXPSWLRQ
4.0 INSTALLATION
4.5 Line Set Installation (cont.)