ETERNUS LT20 S2
31
Installing the Tape Library
Connecting
Follow these general guidelines:
●
Make sure that your backup application supports the host bus adapter
communicating with the library.
●
If the host server is connected to a network, check with the system adminis-
trator before turning off power.
●
Install a suitably rated HBA.
●
Make sure that LUN scanning is enabled on the HBA.
3.6.2
Power and Signal Cable
V
WARNING
Use approved power cords! Not doing so can result in the following:
–
not meeting individual country specific safety requirements;
–
insufficient conductor amp capacity that could result in overheating
with potential personal injury and/or property damage;
–
an unapproved power cord could fracture resulting in the internal
contacts being exposed, which potentially could subject the user to a
shock hazard. Manufacturer disclaims all liability in the event a non-
manufacturer approved power cord is used.
Manufacturer disclaims all liability in the event a non-manufacturer
approved power cord is used.
V
CAUTION
Installing cables could result in damage to the library, when all involved
devices are not completely separated from the mains supply, e.g. by
disconnecting the power cords or by switching off the circuit breakers.
To connect the signal and power cable to the tape library:
1. In a configuration, shut down and turn off the selected server. Turn off all
attached devices, such as printers and other devices. Remove the power
cables from the server and all attached accessories.
2. Attach one end of the signal cable
–
to the SAS connector of a SAS tape drive.
–
to the FC connector of a FC tape drive.
Содержание ETERNUS LT20 S2
Страница 10: ......
Страница 34: ......
Страница 80: ......
Страница 104: ......
Страница 108: ......
Страница 110: ......
Страница 112: ......
Страница 115: ...ETERNUS LT20 S2 115 Blank ...
Страница 116: ...116 ETERNUS LT20 S2 Related Publications an Links Blank ...