32
ETERNUS
LT20
S2
Connecting
Installing the Tape Library
3. Attach the other end of the signal cable
–
in a SAS configuration to the SAS HBA or a SAS expander.
–
in a Fibre Channel configuration to the FC HBA, an FC hub, an FC device
with two I/O ports or an FC switch.
4. Attach the power cable to the power connector on the back panel of the
library (see figure
).
Figure 19: Attaching the power cord
V
CAUTION
To disconnect all power from the library, remove the power cord from
the outlet. The power button only puts the power on stand-by.
5. Plug the power cable into the nearest properly grounded power outlet.
6. Turn on the library using the power button. Check the LCD screen to make
sure the library is receiving power. If it is not, check the power connections
and your power source. During the Power-On-Self-Test (POST), all four
LEDs are illuminated briefly, followed by a flashing Ready LED. When the
initialization sequence is complete, the Home screen will be displayed.
7. Plug in the host server or workstation and all attached devices.
8. Turn on any other devices you turned off earlier.
9. Turn on the server.
Содержание ETERNUS LT20 S2
Страница 10: ......
Страница 34: ......
Страница 80: ......
Страница 104: ......
Страница 108: ......
Страница 110: ......
Страница 112: ......
Страница 115: ...ETERNUS LT20 S2 115 Blank ...
Страница 116: ...116 ETERNUS LT20 S2 Related Publications an Links Blank ...