background image

English

 

Fujitsu Server BS2000 SE Series

Basic Operating Manual
 

 

Valid for:
SE700(B) / SE500(B) / SE300(B) (basic software V6.2A and higher)
SE710 / SE310 (basic software V6.3A and higher)

Edition December 2019

 

Содержание BS2000 SE Series

Страница 1: ...English Fujitsu Server BS2000 SE Series Basic Operating Manual Valid for SE700 B SE500 B SE300 B basic software V6 2A and higher SE710 SE310 basic software V6 3A and higher Edition December 2019 ...

Страница 2: ...ll rights reserved Delivery subject to availability right of technical modifications reserved All hardware and software names used are trademarks of their respective manufacturers The Xen mark is a trademark of Citrix Systems Inc which manages the mark on behalf of the Xen open source community The Xen mark is registered with the U S Patent and Trademark Office and may also be registered in other ...

Страница 3: ...atures 24 3 1 1 Rack of the SE server 26 3 1 2 Expanded maintenance and operational functions 30 4 Racks 31 4 1 Basic rack 32 4 2 Extension rack 34 4 3 Power supply 36 5 Controls 38 5 1 Rack console 39 5 2 Console switch 47 5 3 Control panel on the SE 390 48 5 3 1 Function of the displays 50 5 3 2 Function of the keys and switches 52 6 Management Unit 54 6 1 Front of the MU 55 6 1 1 Controls 59 6 ...

Страница 4: ...8 8 1 2 Switching the SE server on 79 8 1 3 Switching the SE server off 81 8 2 Switching the SE 390 on and off 83 8 2 1 Switching off in an emergency 84 8 2 2 Switching the SE server on 85 8 2 3 Switching the SE server off 88 9 Environmental protection and service 90 10 Abbreviations 92 11 Related publications 93 ...

Страница 5: ...5 Basic Operating Manual ...

Страница 6: ...r specifications Many hardware components are redundant in design thus ensuring that even if a fault occurs with these components operation can continue with the same performance You can easily upgrade the models on site Information on the hardware lifecycle of the FUJITSU Server BS2000 SE Series Changes since the last edition of the manual With the hardware lifecycle of the SE Series the hardware...

Страница 7: ...7 Figure 1 SE Server SE700 and SE700B ...

Страница 8: ...8 Figure 2 SE Server SE710 ...

Страница 9: ...e for SE servers with SU x86 only resp without an SU 390 SU for a Server Unit independent of the unit type The SU is a component of the SE server that enables the operation of BS2000 Native BS2000 or VM2000 Depending on the unit type a distinction is made between SUs SU 390 for Server Unit 390 type of a Server Unit with one or more 390 processors with the models SU700 in the servers SE700 SE700B a...

Страница 10: ...Component of an SE Server with x86 architecture Server Unit x86 Management Unit or HNC BS2000 server BS2000 server is used as generic term for all SE servers and the former S and SQ servers BS2000 servers are operated with the corresponding BS2000 operating systems BS2000 BS2000 is used for the BS2000 OSD BC operating system in phrases e g in BS2000 system SKP Service Konsol Processor The MU imple...

Страница 11: ... and instructions for installing and using a product version are contained in the associated Release Notice Release Notices in particular those relating to BS2000 OSD XC M2000 X2000 and HNC are also available at http bs2manuals ts fujitsu com The documentation for the SE servers consists of the following parts Operating Manual consisting of a number of modules Basic Operating Manual Operating Manu...

Страница 12: ...As administrator you manage the entire SE server with all its components and the operating systems which run on it You need a good knowledge of the BS2000 Linux and Windows operating systems and of the network and peripherals As administrator you can also manage the integration of the optional Application Units on which an open operating system runs in Native or virtualized mode e g under VMware A...

Страница 13: ...chapters describes the components of the SE server their position in the rack the controls MU and NU as well as how to switch the server on and off There is also a chapter containing the abbreviations used and their meaning A glossary explaining important terms used in this manual can be found in the Administration and Operation manual 5 References to publications are given in the text with shorte...

Страница 14: ... New hardware generation SE310 and SE710 Instead of MU M1 M2 with SE310 and SE710 a new variant MU M3 of the hardware base is used Instead of HNC M1 M2 with SE710 a new variant HNC M3 of the hardware base is used Instead of SU300 with SE310 a new variant SU310 of the hardware base is used Instead of SU700 with SE710 a new variant SU710 of the hardware base is used ...

Страница 15: ...ormed e g entries on the keyboard italics Texts from the SE Manager monospace System inputs and outputs monospace semibold Statements which are entered via the keyboard are displayed in this font abc Variables which are replaced by values number The titles of related publications in the text are abbreviated The complete title of each publication which is referred to by a number is listed in the Re...

Страница 16: ...e Application Unit on a varying hardware base A distinction is made between the models according to the hardware base is for example an Application AU47 Unit based on a PRIMERGY RX4770 HNC High Speed Net Connect The HNC connects the Server Unit 390 to the LAN and as the net client enables the BS2000 systems on the SU 390 to access the Net Storage HNC is also the name used for the HNC software SKP ...

Страница 17: ...17 2 Important notes In this chapter the following subjects are discussed Notes from the manufacturer Notes on safety Installation and operation precautions ...

Страница 18: ...neral industrial applications This product is not intended for use in nuclear reactor control systems aeronautical and space systems air traffic control systems mass transportation control systems medical devices for life support missile launch control systems or other specialized uses in which extremely high levels of reliability are required the required levels of safety cannot be guaranteed or ...

Страница 19: ...ase contact Customer Support Possible data loss if used incorrectly Before shutting down power you should ensure that the following events occur otherwise data may be destroyed All applications have finished processing No user is using the components When a unit of the SE server MU SU HNC or AU is turned off the operating status indicator lights up orange Check this before shutting down the main p...

Страница 20: ...nitial settings Removal of front rear or side covers Mounting de mounting of optional internal devices Plugging or unplugging of external interface cables Maintenance and inspections repairing and regular diagnostics and maintenance CAUTION All maintenance measures for this product and the optional products of the manufacturer may only be performed by Customer Support Users must not perform these ...

Страница 21: ...uneven mechanical loading The racks of the SE server have no stabilizer When an SU or heavy peripherals are pulled out of the rack there may therefore be a risk of it tipping over The power supply for the server components is implemented via power distribution units mounted in the rack which themselves must be connected to the inhouse power supply using appropriate CEE connectors The large number ...

Страница 22: ...les from becoming taut Never disconnect the power cable of the Server Unit while power is being supplied to the SE server Keep objects off the rack and the rack components Never use the rack as a work area Do not allow condensation to form In winter slowly raise the ambient room temperature to prevent condensation from forming in the Server Unit Use the SE server only after it has warmed up suffic...

Страница 23: ...23 3 System overview The description is divided into the following sections Features Rack of the SE server Expanded maintenance and operational functions ...

Страница 24: ...nce configurability and scalability of the monoprocessor performance the SU x86 models range below the SU 390 models SE servers SE700 SE500 and SE300 can optionally be equipped with additional SU x86s For example an SE700 can be equipped with up to two SU300s and an SE300 with up to three SU300s SE servers SE710 and SE310 can only contain exactly one SU Net Unit for SU 390 with HNC Gigabit Etherne...

Страница 25: ...E Manager in the menu see the Operation and Administration manual Hardware HW Inventory 5 Detailed information on the installation data in particular on the dimensions and weights is provided in the data sheet FUJITSU Server BS2000 SE Series See the product site for the relevant server at https www fujitsu com emeia products computing servers mainframe bs2000 Go to and select the desired SE server...

Страница 26: ... the SE310 is equipped with the components of the basic configuration and with optional components Figure 3 System components SE300 and SE300B The following differences arise with the SE310 The rack height is 42 instead of 37 height units The SU310 has only 2 height units instead of 4 height units for the SU300 ...

Страница 27: ...h optional components on the right SE700 SE710 and SE500 The following two figures show how the basic rack of the SE700 resp the SE710 is equipped with the components of the basic configuration and with optional components The equipment for the SE500 is comparable to SE700 ...

Страница 28: ...28 Figure 5 System components SE700 and SE700B The following difference arises with the SE710 The rack height is 42 instead of 37 height units ...

Страница 29: ...29 Figure 6 System components SE710 basic configuration on the left with optional components on the right ...

Страница 30: ... Application Units of the respective SE server configuration Accordingly in the case of a Management Cluster the Units of the involved SE Servers are monitored The Event Logging of the SE Manager logs events that have occurred SE Manager s Alarm Management allows you to notify management systems by SNMP trap or users by e mail when certain events occur Detailed information on the monitoring functi...

Страница 31: ...31 4 Racks The description is divided into the following sections Basic rack Extension rack Power supply ...

Страница 32: ...ack a 19 inch standard rack In the case of the SE700 SE710 and SE500 the control panel is located on the front see If section Control panel on the SE 390 the basic rack is not longer adequate for larger configurations extension racks can be used Figure 7 Basic rack SE700 SE500 SE300 ...

Страница 33: ...33 Figure 8 Basic rack SE710 SE310 ...

Страница 34: ...ension rack The extension rack is a 19 inch standard rack which accommodates additional components for which there is no more space in the basic rack Figure 9 SE server with an extension rack e g SE700 and SE700B ...

Страница 35: ...35 Figure 10 SE710 with two extension racks In all an SE server can comprise at most four extension racks ...

Страница 36: ... installed PDU with 10 x C13 outlets CEE connector 16A blue 3 phase PDU with 3 x 8 x C13 outlets CEE connector 16A red PDU with 8 x C13 outlets CEE connector 32A blue Connection of the power cables Most of the hardware components in the SE server rack do not incorporate any switches which disconnect them from the power source Consequently the power cables of the hardware components must be attache...

Страница 37: ... s fuse and the maximum permissible current of the fuses in the power distribution unit in the rack Free sockets in the power distribution unit may not be used to connect other devices The total permissible current for a power distribution unit could be exceeded if other devices were connected If you have additional requirements please contact Customer Support ...

Страница 38: ...38 5 Controls The description is divided into the following sections Rack console Console switch Control panel on the SE 390 Function of the displays Function of the keys and switches ...

Страница 39: ...ager via the local desktop s browser Safety instructions Pull the rack console slowly toward you until the slide rails lock If the slide rails are not locked the rack console can move unexpectedly Be careful not to catch your fingers when you pull or push on the slide module or when you open or close the LCD etc Do not apply any strong force to the rack console when it is pulled out or when the mo...

Страница 40: ...er to the monitor or if the power is already on to turn off the power to the monitor 2 Power LED This LED lights up green when the power to the monitor is on and lights orange when the monitor is in energy saving mode The light goes off when the monitor is turned off 3 MENU ENTER button Press this button to open the menu to select an item to be adjusted and to save an adjusted setting 4 UP button ...

Страница 41: ...re and the device may be used normally While 1280 1024 is the native full screen resolution the LCD display is full screen for all resolutions For resolutions other than 1280 1024 characters may be blurred and the thickness of thin lines can be uneven This is because the full screen display is made by digital interpolation of the low res output not by physical magnification This is not a machine f...

Страница 42: ...e your finger lightly on the touchpad surface in the direction you want to move the cursor Single clicking Lightly tap the touchpad surface once or click the left button once Double clicking Lightly tap the touchpad surface twice or click the left button twice Dragging Lightly tap the touchpad surface twice and without releasing your finger from the touchpad surface slide your finger to move the c...

Страница 43: ...erating the pointing device with two or more fingers Operating the pointing device while something is on the touchpad Operating the pointing device while water drops are on the touchpad surface while condensation is formed on the touchpad surface or with a wet finger If the touchpad surface or your finger is wet dry or wipe water well before you use the touchpad Do not use a pointed metal object s...

Страница 44: ...for use with the SE server Use the handle 2 to push the cover of the rack console carefully down until it clicks into place Sliding the rack console into the rack Press the buttons 1 to release the rack console Use the handle to slide the rack console into the rack until it clicks into place 2 Tighten the finger screws 3 ...

Страница 45: ...the server The monitor is incorrectly connected to the server Notify Customer Support The screen flickers The monitor is incorrectly connected to the server Notify Customer Support The monitor display looks strange Symptom Cause Action Grid screen that flickers The monitor is unfocused Adjust the focus of the monitor Vertical stripes are visible Monitor adjustment is not correct Adjust the clock a...

Страница 46: ...played AUTO Processing Automatic adjustment was performed with an extremely dark monitor background image Make the monitor image as bright as possible and then press the AUTO EXIT button to redo automatic adjustment ...

Страница 47: ...switch is usually a digital 8 or 16 port KVM switch The KVM switch is integrated into the rack in a vertical position and therefore does not require a height unit In the maximum configuration 5 KVM ports 2 x MU and 3 x SU x86 are occupied in the SE x86 and 8 KVM ports 2 x MU 4 x HNC and 2 x SU x86 in the SE 390 additional AUs where required If more AUs are to be integrated into the SE server the K...

Страница 48: ...10 resp SU500 of the SE server Further information on the SU700 SU710 and SU500 is provided in the Server Unit 390 Operating Manual 2 The physical layout of the control panel of the SE700 SE700B and SE500 SE500B is shown in the figure below Figure 12 Control panel on the rack of the SE700 SE700B and SE500 SE500B On the SE710 there is no more UNIT EMERGENCY switch Its control panel looks like this ...

Страница 49: ...th lamp Switches the Server Unit on When the SU 390 is switched on POWER ON lights up green STAND BY button Switches the SU 390 off but not currentless power supply units in standby mode SYSTEM lamp Displays whether the CPUs of the SU 390 are active STATUS indicator Supplies detailed information on the hardware status error code CHECK lamp Shows whether a fault has occurred The function of the dis...

Страница 50: ...000 this must be interpreted as the error code for a problem In this case Customer Support should be contacted POWER ON STATUS indicator Hardware status Does not light up Does not light up Power failure Does not light up b00 through bFF Power supply units are being initialized Flashing Does not light up in maintenance mode CE0 Standby mode Lights up 001 through 010 Power on sequence is active Ligh...

Страница 51: ...51 up depending on the STATUS Lights up EEE Another error has occurred A detailed error code is displayed on the SVP console Table 1 STATUS indicator ...

Страница 52: ...rating Manual 2 Before pressing the POWER ON key check whether the following requirements are met POWER ON is flashing and the status indicator displays nothing When all displays are off and the status indicator displays nothing the power supply of the Server Unit is switched off In this case switch the fuses in the power distribution cabinet on to supply the Server Unit with power The status indi...

Страница 53: ...begins While the system is powering off the status indicator displays a sequence from 501 through 599 When the Server Unit is switched off POWER ON flashes and the status indicator display is empty Instead of using the key the system can also be switched to standby using the SVP frame AU4 POWER STAND BY IMPL See the Server Unit 390 Operating Manual 2 CAUTION There is a risk of data loss When stand...

Страница 54: ...gn The internal disks power supply units and fans can be replaced during ongoing operation The rack console serves as a monitor for the Management Unit and consequently as local access to the administrative and operating functions of the SE server The M2000 software is preinstalled ex works Detailed information on operating the Management Unit is provided in the Operation and Administration manual...

Страница 55: ... Figure 16 MU M1 front panel 1 HDD fault indicator 2 Power supply fault indicator 3 Temperature fault indicator 4 CPU fault indicator notify Customer Support 5 Storage fault indicator notify Customer Support 6 Fan fault indicator notify Customer Support 7 ID indicator 8 CSS indicator notify Customer Support 9 Global error indicator notify Customer Support ...

Страница 56: ...or 18 ID card green Indicators on the front panel of MU M2 Figure 17 MU M2 front panel 1 Reset button for Customer Support only 2 NMI button for Customer Support only 3 ID button ID indicator 4 CSS indicator orange notify Customer Support 5 Global error indicator orange notify Customer Support 6 HDD SSD activity indicator 7 On Off button Status indicator 8 Status indicator power cable connected ne...

Страница 57: ...rs and control elements on the front panel of MU M3 Pos Label Key Display Function Status 1 RESET Reset key System restart for Customer Support only 2 NMI NMI key For Customer Support only 3 ID ID button ID indicator Identifies the ID display on the front panel and at the I O panel for an easier server identification blue on 4 CSS display Notify Customer Support if on or flashing off orange orange...

Страница 58: ...g slowly 8 Status indicator power cable connected Server switched off and connected to power grid stand by mode Server switched off and not connected to power grid or switched on and normal operation green on off ...

Страница 59: ...ton once When the MU is in operation it is switched off by pressing the On Off button once RST or RESET Reset button Pressing the Reset button reboots the MU NMI NMI button CAUTION Possible loss of data The On Off switch does not disconnect the server from the voltage grid To disconnect from the mains completely remove the power plugs i CAUTION Possible loss of data CAUTION Do not press Possible l...

Страница 60: ...gs Do not light up when the MU is OK If the event is still acute after a power failure the indicator is activated after the restart Light up when a prefailure event was detected The indicator also lights up in standby mode Flash when an error was detected The indicator also flashes in standby mode Irrespective of the color when an indicator lights up or flashes this indicates an error event Please...

Страница 61: ...RAID controller Does not light up no HDD error Lights up HDD Faulty or Rebuild Stopped drive defective needs replacing a rebuild process was stopped or the HDD module is not correctly inserted Slow flashing HDD Rebuild the data is being restored after changing a hard disk drive Fast flashing HDD Identify Four fast flashes pause HDD Predicted Fault Two fast flashes pause HDD Hot Spare The correspon...

Страница 62: ...0 Management Unit MU rear of an MU M1 Figure 21 Management Unit MU rear of an MU M2 Figure 22 Management Unit MU rear of an MU M3 Figures 20 21 and 22 show the rear of an MU M1 MU M2 and MU M3 with PCIe slots which are not equipped ...

Страница 63: ...cator MU M3 1 ID CSS Global error indicator ID ID indicator blue Lights up blue when the MU has been selected by pressing the ID button To deactivate press the button again The ID indicator can also be activated via the ServerView Operations Manager and the iRMCS4 web interface and the status can be reported to the ServerView Operations Manager and the iRMCS4 ...

Страница 64: ...indicator is activated after the restart Light up when a prefailure event was detected The indicator also lights up in standby mode Flash when an error was detected The indicator also flashes in standby mode Irrespective of the color when an indicator lights up or flashes this indicates an error event Please notify customer support LAN indicators Figure 26 LAN indicators MU M1 Figure 27 LAN indica...

Страница 65: ... Does not light up when a LAN transfer is in progress Flashes green Indicator on hot plug power supply unit Figure 29 Indicator on hot plug power supply unit 1 Flashes green when the MU is switched off but line voltage is present standby mode Lights up green when the MU is switched on and functioning properly Flashes orange when a predictable error has been detected but the power supply unit is st...

Страница 66: ...inciple of PCIe slot assignment at the rear of the device MU M1 The figure shows the PCIe slots of the MU M1 on an SE700 On the various model series of the SE server the PCIe slots of an MU M1 are assigned as follows PCIe slot SE700 SE500 SE300 S1 not assigned not assigned not assigned S2 USB card USB card not assigned S3 FibreChannel card FibreChannel card not assigned Table 2 PCIe slot assignmen...

Страница 67: ...ee PCIe slot S2 Accordingly two more ports are available for the ROBAR connection and cluster functionality PCIe slot assignment on the MU M3 Figure 32 Principle of PCIe slot assignment at the rear of the device MU M3 The figure shows the PCIe slots of the MU M3 on an SE710 On the various model series of the SE server the PCIe slots of an MU M3 are assigned as follows PCIe slot SE710 SE310 S2 Fibr...

Страница 68: ... The Net Unit contains the following components Switches A redundant Net Unit has redundant switches by default in the case of SE 390 Optional port extension A redundant Net Unit can on SE 300 be complemented by a redundant port extension to increase the number of redundant LAN ports HNC in SE 390 The HNC connects the Server Unit 390 with the LAN Up to 4 HNCs are possible Extensions of the Net Uni...

Страница 69: ...able ICX 6450 48 with 48 copper ports 10 100 1000 Mbps 4 optical ports SFP 1 oder 10 Gbps uplink ports stacking capable Brocade switches ICX 7450 48 are used from the HW generation SE310 and SE710 onwards These are designed redundantly as usual with SE 390 with SE x86 there is a redundancy extension 2nd switch in addition to one switch in the basic configuration A port extension of a redundantly d...

Страница 70: ...6450 48 front Figure 35 Net Unit ICX 7450 48 front 1 System LEDs 2 Media Stacking module LEDs 3 Stack unit ID display 4 Management port RJ 45 5 USB port for flash drive 6 Mini USB console port 7 Reset button 8 10 100 1000Base T RJ 45 ports 1 1 1 1 1 48 9 SFP ports 1 2 1 1 2 4 ...

Страница 71: ...J 45 port by default not used On 24 port models the management interfaces are arranged at the center on the front and on 48 port models on the left hand side at the front see the figures below Figure 36 Network and management interfaces ICX 6450 24 Figure 37 Network and management interfaces ICX 6450 48 Explanation 1 Console management port 2 Slot 2 SFP and SFP uplink or stacking capable ports 3 O...

Страница 72: ...d meaning Ethernet Lights up green and flashes when the port is transferring and receiving data packets Does not light up when no connection to a remote port exists SFP SFP X1 X4 Lights up green when the port is transferring 10 Gbps when data packets are being transferred and received Lights up green and flashes Lights up yellow when the port is transferring 1 Gbps when data packets are being tran...

Страница 73: ...he customer is displayed by the SE Manager in the main menu Hardware IP networks Power status LED indicator Figure 41 Power status LED indicator ICX 6450 24 Figure 42 Power status LED indicator ICX 6450 48 1 shows the power status LED The following status indicators are possible LED Display and meaning PWR Power Does not light up when no power is supplied Lights up green when the internal power su...

Страница 74: ...74 Lights up yellow when the internal power supply has failed and power is being supplied from an external power supply EPS Table 6 Meaning of the power status LED indicator ...

Страница 75: ...nsion i e with two switches meaning that in the maximum configuration 96 redundant LAN ports are available On the SE servers SE300 not on SE310 the port extension is possible if the Net Unit is redundant in design Please inquire about the current possibilities of a port extension at the Fujitsu Technology Solutions Sales department HNC High speed Net Connect on the SE 390 The High speed Net Connec...

Страница 76: ...d into the following sections Switching the SE x86 on and off Switching off in an emergency Switching the SE server on Switching the SE server off Switching the SE 390 on and off Switching off in an emergency Switching the SE server on Switching the SE server off ...

Страница 77: ...ee the information in the Quick Guide 7 This chapter describes the actions for switching these units on off which can be performed directly on the SE server SE x86 as an alternative to switching it on off remotely Further information on this subject and also on the subjects IPL console and SE Manager is provided in the Operation and Administration manual 5 ...

Страница 78: ... Management Unit manually via the operating panel at the front of the unit for the MU see and for figure 16 17 18 the SU and AU see the Server Unit x86 and Additive Components Operating Manuals Optional hardware 3 4 components have their own On Off switches or are switched on off automatically together with the Server Unit e g ETERNUS JX40 see Additive Components 4 CAUTION Operation of the SE serv...

Страница 79: ...all the SE Manager e g after logging in on the local console via the browser of the Linux desktop in the Computer menu in the task bar or via an administration PC default see the Operation and Administration manual 5 You can also switch on the MU remotely via the iRMC of the MU see the Operation and Administration manual 5 3 Switch on the Server Unit Before the Server Unit is switched on the statu...

Страница 80: ...ication Unit by pressing the On Off switch The power on indicator lights up green The Application Unit switches on conducts a system test and starts the operating system Further optional Application Units are switched on in the same way The controls indicators and further on off options for the AU are described in the Additive Components Operating Manual 4 i ...

Страница 81: ...ager menu tab symbol see the Operation and Administration Hardware Units Units Power off manual 5 When the Server Unit is switched off the BS2000 system is shut down properly taking into account the remaining runtime specified Before the Server Unit is switched off the power on indicator lights up green and after it has been switched off it lights up orange Check this before continuing Further Ser...

Страница 82: ... resp 8 in Check this before continuing figure 16 17 18 4 Switch off the optional hardware components Switch off the ETERNUS LT140 resp ETERNUS LT40 S2 tape library as well as the ETERNUS DX100 S4 disk storage system using the On Off switch on the front see the Additive Components Operating Manual 4 Switch off any other connected hardware components The ETERNUS JX40 S2 disk storage system connecte...

Страница 83: ...ee the information in the Quick Guide 7 This chapter describes the actions for switching these units on off which can be performed directly on the SE server SE 390 as an alternative to switching it on off remotely Further information on this subject and also on the subjects IPL console and SE Manager is provided in the Operation and Administration manual 5 ...

Страница 84: ...n SE700 and SE500 only by pressing the UNIT EMERGENCY switch Pressing the UNIT EMERGENCY switch causes an abbreviated power off routine to be started The UNIT EMERGENCY switch is on SE700 and SE500 only at the bottom of the control panel see figure 43 Pressing the POWER STAND BY button or UNIT EMERGENCY switch does not disconnect the system completely from the power source POWER STAND BY To cut th...

Страница 85: ...LT40 S2 tape library using the On Off switch at the front see the Additive Components Operating Manual 4 Switch on any other connected hardware components 2 Switch on the MU The power on indicator item 11 in resp item 8 in lights up orange POWER STAND BY figure 16 figure 17 18 Switch on the rack console by pulling out and folding out the monitor see Rack console Press the On Off switch on the MU i...

Страница 86: ...start the BS2000 system using PROGRAM LOAD FRAME DETAIL 1 When a POWER ON IPL is configured the BS2000 system is loaded automatically using AUXILIARY FRAME LOAD PRESET1 Alternatively the IPL can also be initiated in the SE Manager see the menu Systems se server SE model Operation and Administration manual unit SU 390 BS2000 operation mode 5 4 Switch on the optional Server Units x86 SE700 SE500 onl...

Страница 87: ...the Operation and Administration manual Hardware Units Units Switch on 5 Alternatively switch on the Application Unit by pressing the On Off switch The power on indicator lights up green The Application Unit switches on conducts a system test and starts the operating system Further Application Units are switched on in the same way The controls indicators and further on off options for the AU are d...

Страница 88: ...l see the Operation and Administration Hardware Units Units Switch off manual 5 When the Server Unit is switched off the BS2000 system is shut down properly taking into account the remaining runtime specified Before the Server Unit is switched off the power on indicator lights up green and after it has been switched off it lights up orange Check this before continuing Alternatively you can switch ...

Страница 89: ...f the MU Switch off the MU using the SE Manager menu tab symbol see the Hardware Units Units Switch off Operation and Administration manual 5 Before the MU is switched off the power on indicator lights up green and after it has been switched off it lights up orange item 11 resp 8 in Check this before continuing figure 16 17 18 Redundant MUs are switched off in the same way 5 Switch off the optiona...

Страница 90: ...igned in accordance with the guideline environmentally friendly product design and development of FUJITSU This means that the designers have taken into account critical factors such as durability selection of materials and coding emissions packaging the ease with which the product can be dismantled and the extent to which it can be recycled This saves resources and thus reduces the harm done to th...

Страница 91: ...issing parts or incomplete delivery please contact the FUJITSU complaints department Email RLC ts fujitsu com Tel 49 0 3634 330 1758 Fax 49 0 3634 330 1814 If you have questions on operation or if problems occur please contact your local FUJITSU Customer Support in Germany under Tel 49 0 89 3564 80 000 You can find all service numbers on the FUJITSU support pages http support ts fujitsu com IndexC...

Страница 92: ...e Fibre Channel Host Bus Adapter Hard Disk Drive High speed Net Connect Height Unit IDentifier Integrated Remote Management Controller Integrated Services Digital Network Internet Protocol Information Technology Local Area Network Liquid Crystal Display Light Emitting Diode Linear Tape Open Non Maskable Interrupt Management Unit Operator Control Panel Peripheral Component Interconnect Redundant Ar...

Страница 93: ...ver at http manuals ts fujitsu com 1 FUJITSU Server BS2000 SE Series Basic Operating Manual 2 FUJITSU Server BS2000 SE Series Server Unit 390 Operating Manual 3 FUJITSU Server BS2000 SE Series Server Unit x86 Operating Manual 4 FUJITSU Server BS2000 SE Series Additive Components Operating Manual 5 FUJITSU Server BS2000 SE Series Operation and Administration User Guide 6 FUJITSU Server BS2000 SE Se...

Отзывы: