FLARING

(1) Cut the connection pipe to the necessary 

length with a pipe cutter.

(2)  Hold the pipe downward so that cuttings will 

not enter the pipe and remove the burrs.

(3) Insert 

the 

fl

 are nut onto the pipe and 

fl

 are the 

pipe with a 

fl

 aring tool.

Insert the flare nut (always use the flare nut 
a t t a c h e d  t o  t h e  i n d o o r  a n d  o u t d o o r  u n i t s 
respectively) onto the pipe and perform the 

fl

 are 

processing with a 

fl

 are tool.

U s e  t h e  s p e c i a l  R 4 1 0 A  f l a r e  t o o l ,  o r  t h e 
conventional (for R22) 

fl

 are tool.

When using the conventional 

fl

 are tool, always use 

an allowance adjustment gauge and secure the A 
dimension shown in table 2.

BENDING PIPES

(1)  When bending the pipe, be careful not to crush it.
(2)  To prevent breaking of the pipe, avoid sharp bends.
 

Bend the pipe with a radius of curvature of 70 mm or over.

(3)  If the copper pipe is bend the pipe or pulled to often, it will become stiff. Do not 

bend the pipes more than three times at one place.

Holding spanner

90°

Body side

Torque wrench

To prevent gas leakage, coat the 

fl

 are 

surface with refrigerator oil.

Table 1 

Flare nut tightening torque

Flare nut

Diameter (mm)

 

x Torque (N • m

)

6.35 mm dia.

17 x

 

16 ~ 18

15.88 mm dia.

26 x 63 ~ 75

Table 2 

Pipe outside diameter

Pipe outside

diameter

A (mm)

Flare tool for

R410A, clutch type

Conventional (R22) Flaring tool

Clutch type

Wing nut type

ø 6.35 mm (1/4")

0 to 0.5

1.0 to 1.5

1.5 to 2.0

ø 15.88 mm (5/8")

0 to 0.5

1.0 to 1.5

1.5 to 2.0

 CAUTION

Fasten a 

fl

 are nut with a torque wrench as instructed in this manual. If fastened too 

tight, the 

fl

 are nut may be broken after a long period of time and cause a leakage of 

refrigerant.

5.6. Air purge

Always use a vacuum pump to purge the air.
Refrigerant for purging the air is not charged in the outdoor unit at the factory.

Close the high pressure side valve of the gauge manifold fully and do not operate it during 
the following work.

 CAUTION

Refrigerant must not be discharged into atmosphere.

After connecting the piping , check the joints for gas leakage with gas leak detector. 

 (1)  Check if the piping connections are secure.
 (2)  Check that the stems of 2-way valve and 3-way valve are closed fully.
 (3)  Connect the gauge manifold charge hose to the charging port of the 3-way valve (side 

with the projection for pushing in the valve core).

 (4)  Open the low pressure side valve of the gauge manifold fully.
 (5)  Operate the vacuum pump and start pump down.
 (6)  Slowly loosen the 

fl

 are nut of the 3-way valve and check if air enters, then retighten 

the 

fl

 are nut.

   (When the 

fl

 are nut is loosened the operating sound of the vacuum pump changes 

and the reading of the compound pressure gauge goes from minus to zero.)

 (7)  Pump down the system for at least 15 minutes, then check if the compound pressure 

gauge reads -0.1 MPa (-76 cmHg, -1 bar).

 (8)  At the end of pump down, close the low pressure side gauge of the gauge manifold 

fully and stop the vacuum pump.

 (9)  Slowly loosen the valve stem of the 3-way valve. When the compound pressure 

gauge reading reaches 0.1-0.2 MPa, retighten the valve stem and disconnect the 
charge hose from the 3-way valve charging port.

    (If the stem of the 3-way valve is opened fully before the charge hose is disconnect-

ed, it may be dif

fi

 cult to disconnect the charge hose.)

(10)  Fully open the valve stems of the 2-way valve and 3-way valve using a hexagon 

wrench. (After the valve stem begins to turn, turn it with a torque of less than 
2.9 N • m (30 kgf • cm) until it stops turning.)

(11)  Firmly tighten the 2-way valve and 3-way valve blank cap and the charging port cap.

3-way valve

2

-way valve

Charging

 port cap

Vacuum pump

Charge 
hose

Charge hose

Charging port

Blank cap

Valve stem

Flare nut

Compound pressure gauge

Gauge manifold

Pressure gauge

High 
pressure 
side valve  
(closed)

Low

 pressure 

side

 valve

-0.1 MPa 
(-76 cmHg 
-1 bar)

Tightening torque

Blank cap (2-way valve)

20.0 to 25.0 N • m (200 to 250 kgf • cm)

Blank cap (3-way valve)

28.0 to 32.0 N • m (280 to 320 kgf • cm)

Charging port cap

12.5 to 16.0 N • m (125 to 160 kgf • cm)

5.7. TEST RUN

  Perform test operation and check items below.

  For the test operation method, refer to the operating manual.

   The outdoor unit, may not operate, depending on the room temperature. In this case, 

press the TEST RUN button on the remote controller while the air conditioner is running, 
(Point the transmitter section of the remote controller toward the air conditioner and 
press the TEST RUN button with the tip of a ball-point pen, etc.)

  To end test operation, press the remote controller START/STOP button.

   (When the air conditioner is run by pressing the TEST RUN button, the OPERATION 

indicator lamp and TIMER indicator lamp will simultaneously 

fl

 ash slowly.)

OUTDOOR UNIT

(1)  Is there any abnormal noise and vibration during 

operation?

(2)  Will noise, wind, or drain water from the unit 

disturb the neighbors?

(3)  Is there any gas leakage?

5.8. CUSTOMER GUIDANCE

Explain the followings to the customer in accordance with the operating manual:
(1)  Starting and stopping method, operation switching, temperature adjustment, timer, 

air

fl

 ow switching, and other remote controller operations.

(2) Air 

fi

 lter removal and cleaning, and how to use the air

fl

 ow direction louvers.

(3)  Give the operating and installation manuals to the customer.

6. PUMP DOWN

6.1. Pump down

PUMP DOWN OPERATION (FORCED COOLING OPERATION)

To avoid discharging refrigerant into the atmosphere at the time of relocation or disposal, 
recover refrigerant by doing the cooling operation or forced cooling operation according 
to the following procedure. (When the cooling operation cannot start in winter, and so on, 
start the forced cooling operation.).
(1)  Do the air purging of the charge hose by connecting the charging hose of gauge mani-

fold to the charging port of 3-way valve and opening the low-pressure valve slightly.

(2)  Close the valve stem of 2-way valve completely.
(3)  Start the cooling operation or following forced cooling operation. Keep on pressing the 

MANUAL AUTO button of the indoor unit for more than 10 seconds. The operation in-
dicator lamp and timer indicator lamp will begin to flash simultaneously during test run. 
(The forced cooling operation cannot start if the MANUAL AUTO button is not kept on 
pressing for more than 10 seconds.)

(4)  Close the valve stem of 3-way valve when the reading on the compound pressure 

gage becomes 0.05~0 Mpa(0.5~0 kg/cm

2

).

(5)  Stop the operation.

• Press the START/STOP button of the remote control unit to stop the operation.
•  Press the MANUAL AUTO button when stopping the operation from indoor unit side. (It 

is not necessary to press on keeping for more than 10 seconds.)

Transmitter section

TEST

 

RUN

 

button

Check if [L] is 

fl

 ared uniformly and 

is not cracked or scratched.

Die

A

Pipe

9332808039_IM.indb   4

9332808039_IM.indb   4

2012-10-8   11:35:38

2012-10-8   11:35:38

Содержание AOYG24LFC

Страница 1: ...h s i l g n E INSTALLATION MANUAL For authorized service personnel only INSTALLATION MANUAL AOYG24LFC OUTDOOR UNIT PART No 9332809039 ...

Страница 2: ...egulation and laws in use on installation place The installation must be carried out in compliance with regulations in force in the place of installation and the installation instructions of the manufacturer This unit is part of a set constituting an air conditioner It must not be installed alone or with non authorized by the manufacturer The unit must be correctly earthed grounded and the supply ...

Страница 3: ...0 g 200 g 300 g 20 g m CAUTION When adding refrigerant add the refrigerant from the charging port at the completion of work The maximum length of the piping is 30 m If the units are further apart than this correct operation can not be guaranteed 2 6 Accessories The following installation accessories are supplied Use them as required Drain pipe 1 Drain cap 3 Installation manual 1 One set of followi...

Страница 4: ...e plug Do not use the earth screw for an external connector Only use for interconnection between two units 5 5 Connecting the piping CONNECTION 1 Install the outdoor unit wall cap supplied with the optional installation set or pro cured at the site to the wall pipe 2 Connect the outdoor unit and indoor unit piping 3 After matching the center of the flare surface and tightening the nut hand tight t...

Страница 5: ...open the valve stems of the 2 way valve and 3 way valve using a hexagon wrench After the valve stem begins to turn turn it with a torque of less than 2 9 N m 30 kgf cm until it stops turning 11 Firmly tighten the 2 way valve and 3 way valve blank cap and the charging port cap 3 way valve 2 way valve Charging port cap Vacuum pump Charge hose Charge hose Charging port Blank cap Valve stem Flare nut ...

Отзывы: