![Fujitsu AOA72LALT Скачать руководство пользователя страница 74](http://html.mh-extra.com/html/fujitsu/aoa72lalt/aoa72lalt_design-and-technical-manual_2344011074.webp)
- (02 - 33) -
O
U
TD
O
O
R U
N
IT
AO
A
72
-9
0L
A
LT
O
U
TD
O
O
R U
N
IT
AO
A
72
-9
0L
A
LT
Caution
Use ø5 tapping screws having a thread length of 10 to 20mm.
●
Do not remove any screws from where a circle is not marked.
●
Do not make a hole in the dowels where a circle is not marked. Otherwise, damage to the internal
●
parts will cause performance degradation or trouble.
SNOW HOOD INSTALLATION PROCEDURE
Installing the upper part of snow hood
z
The upper part of snow hood can be installed in the same manner as for the duct. For
●
details such as where to fix it, see the duct installation procedure.
Using the fixing positions on the top panel, install the components such as the frame,
●
column, front panel, top panel, and rear panel.
Installing the sides of snow hood
z
Before starting snow hood installation, remove the screws from the external net to remove
●
the net.
Install the snow hood, using the screw holes shown in the figure on the next page.
●
Remove the screws from where circles are marked in the figure, and make a ø4.6mm hole
●
in each dowel.
Содержание AOA72LALT
Страница 2: ...1 INDOOR UNIT DTR_AR061E_03 2013 11 08 DUCT TYPE AR C72LHTA AR C90LHTA ...
Страница 12: ... 01 09 DUCT TYPE AR C72 90LHTA DUCT TYPE AR C72 90LHTA DIMENSIONS 444 MODEL AR C72LHTA Unit mm ...
Страница 13: ... 01 10 DUCT TYPE AR C72 90LHTA DUCT TYPE AR C72 90LHTA MODEL AR C90LHTA Unit mm ...
Страница 15: ... 01 12 DUCT TYPE AR C72 90LHTA DUCT TYPE AR C72 90LHTA WIRING DIAGRAMS 555 MODEL AR C72LHTA AR C90LHTA ...
Страница 39: ...SINGLE TYPE AO A72LALT AO A90LALT 2 OUTDOOR UNIT DTR_AO133E_02 2013 11 08 ...
Страница 52: ... 02 11 OUTDOOR UNIT AO A72 90LALT OUTDOOR UNIT AO A72 90LALT WIRING DIAGRAMS 555 MODEL AO A72LALT AO A90LALT ...
Страница 58: ... 02 17 OUTDOOR UNIT AO A72 90LALT OUTDOOR UNIT AO A72 90LALT SOUND LEVEL CHECK POINT 111111 Microphone 1 m 1 m ...