![FujiFilm PL-G.MAX Скачать руководство пользователя страница 49](http://html.mh-extra.com/html/fujifilm/pl-g-max/pl-g-max_operation-manual_2343509049.webp)
- 47 -
OPERATION IN EACH SITE SITUATION
When a subway is passing below the buried
pipeline.
When the pipeline is in a factory
6-16 When there are reinforcement bars in
the pavement
There may be cases in which rebar is in the pavement,
such as in gas stations, or a factory where a large vehicle
enter. This makes locating and depth measurement of a pipe
impossible.