-10-
Rev.1 13/12/16
REPLACING LOAD CHAIN
Fasten a length of wire to the end of the load chain.
Thread the wire into the hoist from the lifting
side through the chain guide and operate the hoist
to pull the wire through the hoist and out of
the lowering chain guide.
WARNING
Use extreme caution when operating hoist.
Keep hands and clothing away from wire
and chain while in motion. Be prepared
to stop hoist or quickly reverse direction.
Operate the hoist as slowly as possible.
Reduce the air supply pressure if necessary
to reduce speed.
Carefully check that the chain welds are all
facing away from the hoist and no twist is
present. Also note that the end link must
be parallel to the valve shaft.
Maintain tension in the wire and operate the hoist
in the lowering direction until the end of the link
is entering the pocket of the drive chain wheel
then operate the hoist in the raising direction.
After the chain comes out of the chain guide pass
it through the valve lever and attach it to the casing.
If the chain must be twisted to be attached, it must
be pulled back out of the hoist and reinstalled properly.
LOWER HOOK ASSEMLY
( Model FAH-100L only )
When installing the load through the lower hook
be sure that all twist has been removed from
the chain. The welds on every link must face in
exactly the same direction the full length of
the chain.
If the end link is not parallel to the valve shaft,
it must be removed to allow the parallel link
to be used.
Содержание FAH-100LC
Страница 1: ...Rev 1 13 12 16 ...
Страница 17: ... 15 Rev 1 13 12 16 ...
Страница 19: ... 17 Rev 1 13 12 16 ...
Страница 24: ...FUJI INDUSTRIAL TECHNIQUE CO LTD ...