CR-IR346RU
Service Manual
IN - 6
010-051-00
10.10.2000 FM2887 (1)
IN - 6
3.
Preparation for Installation
3.1
Precautions Regarding Installation
The place where the machine is to be installed needs to meet the criteria set forth in “Getting
Started” and “
■
Installation Site Requirements”.
Preinstallation procedures should be performed beforehand for necessary construction work,
electrical work, and air-conditioning system installation.
■
Installation Site Requirements
Avoid the following installation sites:
• Places where the temperature changes drastically.
• Places near heat sources such as heaters.
• Places where water leakage or equipment submersion may occur.
• Places where corrosive gas may be generated.
• Dusty places.
• Places where the machine is subject to constant or excessive vibration or shock.
• Places that are exposed to direct sunlight.
■
Handling Precautions for Printed Circuit Boards and Optical Unit
When servicing a board or optical unit, use a wristband to ground your body. If you body is
not grounded, the electrostatic buildup on your body may damage the electronic parts.
010-051-01
08.30.2001 FM3058