FSA GT7-2K Скачать руководство пользователя страница 6

O-rings | Every 1 – 2 Years, must be changed if installing a new quartz 

GT7-2NSF-OR 

 

O-Ring Suit 23mm Thimble (GT7-2K + GT7-4K) 

GT7-8NSF-OR 

 

O-Ring Suit 24.5mm Thimble (GT7-8K) 

Replacement Ballast | Replace after 5 years as a precaution 

GT7-8K-PS 

 

10W – 40W AU Certified (RCM) Ballast to Suit 4 Pin Lamps 

Mounting Clamps 

GT11-8G 

 

 

1 pc Plastic Mounting Clamp Suitable for U/Sink Installation.

 

GT7-8-BRK 

 

 

1 Pair Aluminium Mounting Brackets Suit GT7-4K GT7-8K 

Troubleshooting 

Problem 

Possible Cause(s) 

Solution 

Leaking from 
Chamber 

1. O-rings Not Seated 
 
 
2. Knurled Nuts too Loose 
 
 
 
 
3. Damaged Thimble 
 
 
 
 
 
 

1.

 If there is any issue with the o-rings in the way 

they are seated this will need to be fixed. Remove 
the thimble and repeat steps 3 – 5 

2.

 If the nuts are not tight enough, the o-rings will not 

have good enough compression and will cause a 
leak. Slightly tighten up the nuts until a watertight 
seal is achieved. It is better to tighten slightly at a 
time to prevent overtightening.  

3.

 If there is a crack or hole in the thimble, it will fill 

from the inside out. Turn off the water, carefully 
remove the thimble and replace with a new one. If 
the thimble releases and shards of glass, this 
chamber and downstream plumbing will need to be 
thoroughly checked and any glass removed before 
re-connection. 

High Water 
Temperature 

1. Low Flow Rate 
 
 
 
 
 
 
 
 
2. Oversized System 

1.

 Particularly on the smaller model (GT7-2K) if 

there are periods of low water usage or the water is 
allowed to stand for long periods of time, the water 
may be prone to heating up and may be either 
lukewarm or hot. Generally, this only occurs on 
systems that have a short distance between the 
outlet and point of use. Whole house systems have 
a larger length of cold plumbing pipes downstream 
which will dissipate this temperature. 

2.

 If the system is too large for the application, it is 

likely that even with frequent water usage, the water 
does not get a chance to cool down effectively. If 
there are significant fluctuations in usage or flow 
rates, it is good practice to install a thermal relief 
valve (sold separately) on the outlet of the UV 
chamber which can bleed water from the chamber 
and keep temperatures below 56°C 

Hot SS Chamber 

1. Low Usage 

1.

 As above, if the water is allowed to stand for 

periods of time, the chamber will heat up naturally. 
This is normal, however if the heating is excessive to 
the point where it is causing damage to the chamber 
or surrounding fixtures, a thermal relief valve (sold 
separately) on the outlet of the UV chamber which 
can bleed water from the chamber and keep 
temperatures below 56°C 

Ballast is alarming 

1. Lamp Failure 
 
 
 
 

1.

 Usually if the ballast is alarming and showing a 

red flashing status indicating light, the lamp has 
failed and will require replacement. Before replacing 
a lamp, it is best to check firstly for an external 
cause for lamp failure turn off the power then check 

Содержание GT7-2K

Страница 1: ...ase Open 2 V Space Requirements 3 VI What is Ultraviolet Sanitation 3 VII Example Applications 3 Installation Introduction 3 I Site Preparation 3 II Mounting 4 III Installing Connections 4 IV Filter P...

Страница 2: ...he unit from power surges Danger Dangerous electrical voltage is present inside the power supply box chamber These instructions must be followed closely tom prevent serious personal injury Ensure Eye...

Страница 3: ...il it is finally eradicated Ultraviolet filtration is a chemical free solution to water sanitation creating no by products in the water Ultraviolet systems are rated based on a dosage level of radiati...

Страница 4: ...knurled nut goes at the open end of the thimble Loosely screw on both nuts until you feel resistance Then simultaneously tighten both nuts by hand until it is firmly hand tight NOTE Firmly hand tighte...

Страница 5: ...not a waterproof seal and is not designed to seal the water in the chamber it is only to hold the lamp in place and protect from slight splashing water this does not make the chamber IP rated as water...

Страница 6: ...tem 1 Particularly on the smaller model GT7 2K if there are periods of low water usage or the water is allowed to stand for long periods of time the water may be prone to heating up and may be either...

Страница 7: ...failed This can also occur from shorts and water ingress Check for signs of a short around the lamp connection end The ballast will need to be replaced The UV lamp may also have blown at the same time...

Страница 8: ...by a qualified plumber The consumer is responsible for keeping record and proof of installation in the form of an invoice and or receipt Filter systems must be maintained as per FSA recommendations i...

Страница 9: ...ty is valid only if the following conditions are met The System was installed by a licenced plumber proof of installation required in the form of a receipt or invoice for works The system was maintain...

Отзывы: