background image

HEATED PASS THROUGH

INSTALLATION, OPERATION, SERVICE, AND PARTS

1

1.

Parts Ordering and Service Information

Parts orders may be placed directly with your local Frymaster Factory Authorized Service Center
(FASC)/Distributor. A list of Frymaster FASC/ Distributors was included with the unit when
shipped from the factory. Your nearest FASC can also be found on Frymaster’s Web site,
Frymaster.com. or you can contact the Frymaster Service Department at 1-800-24-FRYER or 1-318-
865-1711.

To speed up your order, the following information is required:
Model Number _________________________
Serial Number _________________________
Voltage_______________________________
Item Part Number_______________________
Quantity Needed _______________________

Service may be obtained by contacting your local Frymaster Authorized Service Center/Distributor.
Service information may be obtained by calling the Frymaster Service Department. The following
information will be needed in order to assist you quickly and efficiently:

Model Number _________________________
Serial Number _________________________
Nature of theProblem_____________________________________________________________
______________________________________________________________________________
______________________________________________________________________________

Also include any other information which may be helpful in solving your service problem.

RETAIN AND STORE THIS MANUAL IN THE EQUIPMENT MANUAL FOR FUTURE USE.

2.

General

The 

Heated Pass Through

 or 

HPT 

is designed to hold assembled sandwiches.  By circulating heated

air evenly across the open staging area, the unit keeps sandwiches hot without drying or cooking.

3.

Installation/Set Up

Upon arrival, inspect the HPT for concealed damage.  Immediately report any damage to the
delivering freight company.  Claims must be filed within 15 days after receipt of the unit.

Make sure that the unit is placed on an even surface and that the area surrounding the HPT is free of
clutter that would interfere with airflow.

Install the Filter Screen

The filter screen is designed to prevent debris from
entering the cowl assembly and clogging the
blower.  Slip the part over the vent opening on the
ON/OFF switch side of the unit.  The filter screen
snaps into position.  If it is equipped with an
optional holding screw, tighten the screw to pull the
filter screen snug into position.

The filter screen snaps into place on the air-intake
tower.

Содержание Heated Pass Through none

Страница 1: ...rcial Food Equipment Service Association recommends using CFESA Certified Technicians Price 6 00 8195931 24 Hour Service Hotline 1 800 551 8633 819 5931 April 2003 Heated Pass Through Installation Ope...

Страница 2: ...____________________________________________ ______________________________________________________________________________ ____________________________________________________________________________...

Страница 3: ...3 Place product in the HPT in accordance with the restaurant s established procedures THIS APPLIANCE IS EQUIPPED WITH A GROUNDING PLUG FOR YOUR PROTECTION AGAINST SHOCK HAZARD AND MUST BE PLUGGED INT...

Страница 4: ...voltage is accessable on the controller board with the unit connected to the power source B A potentiometer regulates the heat produced by the air heater It is mounted on the HPT s controller board a...

Страница 5: ...side of the unit Grasp the old leads at the opposite end and gently pull them through the unit NOTE It is easier to pull one lead through at a time If the leads become disconnected while pulling them...

Страница 6: ...an the surfaces thoroughly and apply new gaskets R Slip the slotted brackets on the front section of the air tower assembly up and under the nuts on the tower mounting screws Push inward and down to e...

Страница 7: ...sket over the one already in place and reseat the front section O Once the front section is properly positioned and seated tighten the nuts on the mounting studs to pull it flush against the back of t...

Страница 8: ...HEATED PASS THROUGH INSTALLATION OPERATION SERVICE AND PARTS 7 7 Wiring Diagram...

Страница 9: ...X 1 25 2 pole Fuse 7 807 2819 Fuse 3ab 314 20 Amp 8 106 2790 Board HPT Controller 9 826 1549 Kit 208V Heater Replacement includes heater and acrylic tape 10 826 1551 Kit 208 240V Blower Replacement in...

Страница 10: ...FOR OUTDOOR USE WHEN OPERATING THIS UNIT IT MUST BE PLACED ON A HORIZONTAL SURFACE THE HEATED PASS THROUGH IS NOT SUITABLE FOR INSTALLATION IN AN AREA WHERE A WATER JET CAN BE USED THIS APPLIANCE MUS...

Страница 11: ...THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 12: ...ort Louisiana 71135 1000 Shipping Address 8700 Line Avenue Shreveport Louisiana 71106 TEL 1 318 865 1711 FAX Parts 1 318 219 7140 FAX Tech Support 1 318 219 7135 Price 6 00 PRINTED IN THE UNITED STATE...

Отзывы: