![Frymaster FilterQuick FQG30 Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/frymaster/filterquick-fqg30/filterquick-fqg30_service-manual_2340461010.webp)
1-5
1.7
Checking the Burner Manifold Gas Pressure
1.
On non-CE fryers
only
ensure that the gas valve knob is in the OFF position.
Honeywell
ON
OFF
2.
Remove the pressure tap plug from the gas valve assembly.
Typical Non-CE
Valve Assembly
Typical CE Valve
Assembly
Pressure Tap Plug
3.
Insert the fitting for a gas pressure-measuring device into the pressure tap hole.
4.
On non-CE fryers only
, place the gas valve in the ON position
5.
Place the fryer power switch in the ON position. When the burner has lit and burned steadily for at least
one minute, compare the gas pressure reading to the pressure for the corresponding gas in the appropriate
table on the following page. The tables list the burner manifold gas pressures for each of the gas types that
can be used with this equipment.
Gas
Single
Vat
Dual
Vat
Natural Gas Lacq
(G20) under 20 mbar
7
8
Natural Gas Gronique
*
(G25) under 25 mbar
10
11.2
Natural Gas Gronique
(G25) under 20 mbar
10
11.2
Butane/Propane
(G30) at 28/30 or 50 mbar
17
17
Propane
(G31) under 37 or 50 mbar
20.6
20.6
CE Standard
Burner Manifold Gas Pressures
Pressure (mbar)
* Belgian G25 = 7,0 mbar (single or dual)
Gas
Pressure
Natural
3.20" W.C.
0.80 kPa
Propane
8.25" W.C.
2.5 kPa
Non-CE Standard
Burner Manifold Gas Pressures
Содержание FilterQuick FQG30
Страница 8: ...1 3 ...
Страница 41: ...1 36 1 16 2 Bulk Wiring ...
Страница 56: ...1 51 1 18 6 Clogged Drain Failed Oil Sensor Error Flowchart ...
Страница 57: ...1 52 1 18 7 Menu Trees 1 18 7 1 FilterQuick Controller Setup Menu Tree ...
Страница 58: ...1 53 1 18 7 2 FilterQuick Filter and Info Mode Menu Tree ...
Страница 62: ...1 57 1 20 Principal Wiring Connections ...
Страница 63: ...1 58 1 21 Wiring Diagrams 1 21 1 Main FQG 230 430 120V CE Export ...
Страница 64: ...1 59 1 21 2 Main FQG 230 430 Australia ...
Страница 65: ...1 60 1 21 3 Main FQG 230 430 120V CE Export with Solid Shortening ...
Страница 66: ...1 61 1 21 4 Main FQG 230 430 Australia with Solid Shortening ...
Страница 67: ...1 62 1 21 5 Main FQG 330 530 120V CE Export ...
Страница 68: ...1 63 1 21 6 Main FQG 330 530 Australia ...
Страница 69: ...1 64 1 21 7 Main FQG 330 530 120V CE Export with Solid Shortening ...
Страница 70: ...1 65 1 21 8 Main FQG 330 530 Australia with Solid Shortening ...
Страница 71: ...1 66 1 21 9 Transformer Filter Box 430 530 ...
Страница 72: ...1 67 1 22 Simplified Wiring Diagrams 1 22 1 FilterQuick FQG30 Series Simplified Wiring with Push Pull Handles ...
Страница 73: ...1 68 1 22 2 FilterQuick FQG30 Series Simplified Wiring with Push Buttons ...
Страница 74: ...1 69 1 22 3 FilterQuick FQG30 Series Data Network Flowchart ...
Страница 76: ...1 71 1 24 Shortening Melting Unit Wiring Diagram ...
Страница 77: ...1 72 1 25 Modular Basket Lift Wiring Diagram 100 120V ...
Страница 78: ...1 73 1 26 Modular Basket Lift Wiring Diagram 208 250V ...
Страница 79: ...THIS PAGE INTENTIONALLY LEFT BLANK ...