INSTALLATION AND MAINTENANCE MANUAL
TRANSLATION OF THE
ORIGINAL DOCUMENT
For additional copies visit:
www.frost‐trol.com
ALBORAN BM
SOLID LINES
Versión: -1
-11-
2.
INTALLATION OF THE DISPLAY CABINET
2.1.
CABINET LOCATION
Handling operations and installation of the cabinet are reserved for skilled
person.
Consult the Construction Manager or the person responsible for the installation of
unit. Ask them to inform you of its installation location or if there are any changes
to where it is to be installed.
Check that the installation location chosen is suitable.
The display cabinet must not be installed in places where explosive
gases are present. Do not expose the equipment to atmospheric
agents.
If the chosen location is not suitable for the installation of the cabinet, inform the
Construction Manager or the person responsible for the supermarket accordingly,
so that they can either specify another location or make the necessary
modifications that would make the original location suitable (closure of air vents,
removal of ventilators, closure of doors, etc.).
During the installation (or while carrying out maintenance) you must always wear
proper safety equipment to preserve your security.
2.2.
UPACKING
Unpacking is reserved for skilled personnel.
The cabinet is protected by plastic wrapping. Remove this and take out the
accessories which can be found inside the cabinet:
Using a fork-lift truck or pallet-lift, lift the cabinet, remove the wooden or plastic
supports and replace them with the plastics bases that can be found inside the
cabinet with the other accessories.
Packaging materials (plastic bags, nails, screws, polystyrene, etc.)
should not be left within reach of children as they pose potential
sources of danger.
2.3.
LEVELLING
Use the adjustable bases to level the unit.
Содержание ALBORAN BM
Страница 3: ......