
Commissioning
the cooling unit
NOTE!
The coolant level and cleanliness of the coolant must always be checked before
commissioning the cooling unit.
1
Connect the power source to the mains
2
Turn the power source mains switch to the "I" position
-
The coolant pump starts up
3
Check the coolant flow until you can see a steady return flow of coolant through the
fill nozzle
NOTE!
During welding, check at regular intervals that the coolant is flowing properly.
You should be able to see a steady return flow of coolant through the fill nozzle.
35
EN
Содержание FK 4000
Страница 2: ......
Страница 40: ...40...
Страница 41: ...Troubleshooting 41...
Страница 42: ...42...
Страница 51: ...51 EN...